| Due Date |
Contract # (Project #) |
Project |
|
12/03/10
|
6573 (53W1063) |
Ivy St and Thorpe St |
|
12/03/10
|
6572 (53W1068) |
Joylynne Drive and Douglas Trail |
|
09/24/10
|
6569 (53W1102) |
MMB Elevator Modernization |
|
Future Project
|
6567 (53W0926) |
North Thompson Greenway |
|
Future Project
|
6566 (53W0966) |
Complete renovation, exterior improvements and possible expansion of Madison Central Public |
|
08/06/10
|
6565 (53W1096) |
Membrane Roof Replacement - Water Utility Vehicle Storage Building at 110 S. Paterson St |
|
Future Project
|
6564 (53W1095) |
Droster Road Water Main Replacement |
|
08/27/10
|
6562 (53W1091) |
Truax Area Sewer Access Structure Relining |
|
09/24/10
|
6559 (53W1044) |
Cross Street & Wyota Avenue Storm Sewer - 2010 |
|
08/20/10
|
6558 (53W1090) |
Replace Radiant Heater at Streets Facilities |
|
05/06/11
|
6556 (53W1089) |
Weir Minerals Road Extension |
|
08/13/10
|
6554 (53W1088) |
Elver Park Shelter Patio |
|
08/27/10
|
6553 (53W1087) |
E. Mifflin Bike Boulevard |
|
Future Project
|
6552 (53W1003) |
Landscape Median Maintenance - 2010 |
|
09/24/10
|
6551 (53W0996) |
Debra Lane / Wheeler Road Drainage Assessment District |
|
10/08/10
|
6550 (53W1085) |
Regent Street/Monroe Street 2010 |
|
Future Project
|
6548 (53W1084) |
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2010 (Group B) |
|
07/23/10
|
6546 (53W1083) |
Metro Garage Asphalt Floor Replacement |
|
08/06/10
|
6545 (53W1082) |
Park Street Streetscaping Improvements |
|
Future Project
|
6544 (53W1081) |
Streets Sycamore Bay 3 Trench Drain 2010 |
|
07/09/10
|
6537 (53W0832) |
Force Main Replacement - Waunona Way Lift Station |
|
07/02/10
|
6536 (53W1078) |
Drinking Fountains - 2010 |
|
Future Project
|
6533 (53W0390) |
CTH M - Valley View Road - Pleasant View Road Intersection |
|
Future Project
|
6532 (53W0751) |
University Avenue Pavement Replacement |
|
Future Project
|
6531 (53W1075) |
Wingra Creek Parkway Restoration - 2010 |
|
07/09/10
|
6530 (53W1073) |
Building demoltions at 826,830,834 & 838 W Badger Rd & 2405,2409 & 2413 Cypress Way |
|
Future Project
|
6529 (53W0854) |
CCB Engineering Remodel |
|
07/09/10
|
6526 (53W1072) |
University Ave/Ridge St Intersection Improvements |
|
07/09/10
|
6526 (53W1080) |
Kendall Avenue bike boulevard bump out |
|
Future Project
|
6524 (53W0853) |
Central Park |
|
12/03/10
|
6523 (53W0959) |
Sherman Ave/N. Brearly St Resurfacing |
|
12/03/10
|
6522 (53W0517) |
University Ave/Forest St Resurfacing & Utility Replacement |
|
12/03/10
|
6521 (53W0609) |
Highland/Van Hise/Walnut/University Reconstruction |
|
Future Project
|
6520 (53W0891) |
Webster/Fairchild/Doty Reconstruction (Outer Loop) |
|
12/03/10
|
6519 (53W0633) |
Williamson St/Ingersoll St Resurfacing |
|
11/12/10
|
6518 (53W0902) |
South Point Road Reconstruction |
|
06/25/10
|
6517 (53W1043) |
Carroll Street Forcemain Replacement |
|
04/30/10
|
6514 (53W0991) |
DOWNTOWN STORM DEVICES EL - 2010 |
|
05/28/10
|
6513 (53W1042) |
Mineral Point Landfill Regrading - 2010 |
|
Future Project
|
6511 (53W1040) |
Brittingham Boathouse Interior Restoration |
|
Future Project
|
6506 (53W1034) |
Streets Sycamore Yard Improvements - 2010 |
|
Future Project
|
6505 (53W1033) |
Streets Sycamore Mezzanine Construction - 2010 |
|
06/04/10
|
6503 (53W1027) |
Starker/Academy/Acewood Water Main Replacement |
|
06/04/10
|
6502 (53W1026) |
Forward Drive Water Main Replacement |
|
05/07/10
|
6501 (53W1025) |
Fisher Street Water Main Replacement |
|
05/07/10
|
6500 (53W1024) |
S Segoe Road Water Main Replacement |
|
03/26/10
|
6499 (53W1003) |
Landscape Median Maintenance - 2010 |
|
Future Project
|
6498 (53W0966) |
Complete renovation, exterior improvements and possible expansion of Madison Central Public |
|
06/04/10
|
6497 (53W1023) |
Burrows Park Restroom Reconstruction |
|
04/09/10
|
6496 (53W0990) |
DOWNTOWN STORM DEVICES CS - 2010 |
|
04/09/10
|
6494 (53W1021) |
New Roof - Building B at Goodman Field |
|
08/13/10
|
6490 (53W1019) |
Tenney Bridge Restoration |
|
Future Project
|
6489 (53W1018) |
Warner park Fence Line Replacement |
|
04/30/10
|
6488 (53W1016) |
Warning Sirens - 2010 |
|
06/11/10
|
6487 (53W1015) |
Twin Oaks/Liberty Place Trail Connection |
|
03/26/10
|
6486 (53W1011) |
2010 Parking Ramp Maintenance |
|
Future Project
|
6484 (53W1008) |
CCB Common Council Office Security Window - 2010 |
|
02/19/10
|
6483 (53W0879) |
Resurfacing 2010 |
|
03/26/10
|
6482 (53W1004) |
Boulevard Landscaping - 2010 |
|
03/26/10
|
6481 (53W1003) |
Landscape Median Maintenance - 2010 |
|
05/28/10
|
6480 (53W1002) |
Langdon Street terrace paver repairs |
|
03/12/10
|
6478 (53W0939) |
Restoration Landscaping 2010 |
|
03/12/10
|
6476 (53W1000) |
Street Tree Installation 2010 |
|
04/16/10
|
6475 (53W0995) |
BERNIE'S BEACH BIORETENTION |
|
03/26/10
|
6474 (53W0994) |
Install Direct Gas Fired HVAC Units |
|
03/26/10
|
6473 (53W0993) |
Repaint South Transfer Point Structure |
|
03/26/10
|
6472 (53W0879) |
Resurfacing 2010 |
|
05/28/10
|
6471 (53W0934) |
Cottage Grove Road Sewer Extension Assessment District - 2010 |
|
05/21/10
|
6470 (53W0978) |
Waterways 2010 |
|
Future Project
|
6469 (53W0945) |
Olbrich Drainage Ditch Stabiliztion - 2010 |
|
12/03/10
|
6468 (53W0944) |
Shenandoah Greenway Improvement - 2010 |
|
Future Project
|
6467 (53W0942) |
Forsythia Cunette Rehabilitation - 2010 |
|
Future Project
|
6467 (53W0943) |
Prairie Road Cunette Rehabilitation - 2010 |
|
Future Project
|
6466 (53W0951) |
Kennedy School Storm Bypass |
|
Future Project
|
6465 (53W0940) |
BEDFORD @ NORTH SHORE STORM BOX REPLACEMENT |
|
03/05/10
|
6464 (53W0879) |
Resurfacing 2010 |
|
03/05/10
|
6464 (53W0964) |
Storm Sewer with Resurfacing - 2010 |
|
Future Project
|
6462 (53W0974) |
Senior Center Remodeling - Phase II |
|
08/06/10
|
6460 (53W0973) |
Metro Transit Maintenance Lighting Retrofit - 2010 |
|
08/20/10
|
6459 (53W0972) |
West Streets Maintenance Lighting Retrofit - 2010 |
|
Future Project
|
6458 (53W0971) |
Olbrich Gardens Lighting Retrofit - 2010 |
|
Future Project
|
6457 (53W0970) |
Fleet Services Lighting Retrofit - 2010 |
|
Future Project
|
6455 (53W0750) |
South Street (new street) |
|
06/24/10
|
6454 (53W0871) |
Hughes Place |
|
07/09/10
|
6453 (53W0968) |
Darwin Road Sidewalk |
|
06/04/10
|
6452 (53W0601) |
Riverside Drive Reconstruction |
|
06/04/10
|
6451 (53W0605) |
Gilmore Street and Cross Street Reconstruction |
|
11/12/10
|
6450 (53W0878) |
Bike Paths, 2011 |
|
06/24/10
|
6449 (53W0748) |
Raymond /S. Gammon Resurfacing |
|
04/23/10
|
6448 (53W0607) |
Commercial Ave/Pawling St/Kedzie St/Scofield-Eighth-North Lawn Reconstruction |
|
05/07/10
|
6447 (53W0956) |
Camden Rd/Linda Vista/Hob St |
|
05/07/10
|
6446 (53W0958) |
Sanitary Sewer w/Resurfacing West - 2010 |
|
05/07/10
|
6445 (53W0582) |
School Road (3800 to 4000 block) Assessable Drainage Improvement |
|
05/07/10
|
6445 (53W0920) |
Sanitary Sewer w/Resurfacing East - 2010 |
|
Future Project
|
6444 (53W0955) |
Rosa Road Sidewalk |
|
04/23/10
|
6443 (53W0604) |
N. Third St/Carey Ct/E. Mifflin St Reconstruction |
|
04/09/10
|
6442 (53W0967) |
University Avenue Campus Drive Intersection |
|
03/26/10
|
6441 (53W0887) |
Repairing & Sealing Pavement Cracks, Major Streets-2010 |
|
03/26/10
|
6440 (53W0886) |
Repairing & Sealing Pavement Cracks, Local Streets - 2010 |
|
02/05/10
|
6439 (53W0969) |
CIPP Rehab of Waunona Neighborhood Sanitary Sewers - 2010 |
|
Future Project
|
6437 (53W0966) |
Complete renovation, exterior improvements and possible expansion of Madison Central Public |
|
08/13/10
|
6435 (53W0965) |
Wingra Park Shoreline Repair |
|
Future Project
|
6434 (53W0963) |
Warner Park Parking Lot Reconstruction - Phase I |
|
01/08/10
|
6433 (53W0962) |
Booster Pump Upgrade for Well 25 |
|
01/29/10
|
6432 (53W0961) |
Law Park Concrete Ramp |
|
10/29/10
|
6429 (53W0873) |
Lake Street and Mendota Ct Resurfacing |
|
02/04/11
|
6428 (53W0864) |
W. Gilman Street and N. Carroll Street Reconstruction |
|
02/19/10
|
6427 (53W0879) |
Resurfacing 2010 |
|
02/19/10
|
6426 (53W0879) |
Resurfacing 2010 |
|
02/19/10
|
6425 (53W0879) |
Resurfacing 2010 |
|
02/19/10
|
6424 (53W0879) |
Resurfacing 2010 |
|
02/19/10
|
6423 (53W0881) |
Sidewalk and Curb & Gutter, Citywide Installation and Repair-2010 |
|
03/05/10
|
6422 (53W0880) |
Sidewalk Ordered-2010 |
|
02/19/10
|
6421 (53W0881) |
Sidewalk and Curb & Gutter, Citywide Installation and Repair-2010 |
|
05/21/10
|
6420 (53W0953) |
Merry Street Reconstruction |
|
02/05/10
|
6419 (53W0875) |
University Avenue Pavement Replacement 2010 |
|
10/08/10
|
6418 (53W0739) |
Fair Oaks Avenue Reconstruction |
|
03/26/10
|
6417 (53W0885) |
Chip Sealing 2010-West |
|
03/26/10
|
6416 (53W0884) |
Chip Sealing 2010-East |
|
04/23/10
|
6415 (53W0883) |
Capital Square Streetscape Updates-2010 |
|
03/26/10
|
6414 (53W0874) |
Broom Street Resurfacing |
|
05/07/10
|
6413 (53W0872) |
Ash St and Chadbourne Ave Reconstruction |
|
04/09/10
|
6412 (53W0950) |
Maintenance Facilities & Fire Stations Lighting Retrofit - 2010 |
|
01/29/10
|
6411 (53W0948) |
Tennis Court Resurfacing 2010 |
|
02/12/10
|
6410 (53W0947) |
Park Paving - 2010 |
|
01/22/10
|
6408 (53W0867) |
McCormick Ave (resurf) & Commercial Ave (assess str) |
|
02/12/10
|
6407 (53W0840) |
Parks Office Expansion-Remodel - 2009 |
|
03/19/10
|
6406 (53W0870) |
Femrite Drive and Marsh Road Reconstruction |
|
11/13/09
|
6404 (53W0933) |
Monona Terrace Exhibition, Hall Epoxy floor Resurfacing |
|
11/13/09
|
6403 (53W0932) |
Monona Terrace Exhibition Hall Floor, Electrical Distribution Upgrade |
|
11/27/09
|
6402 (53W0909) |
Station 1 HVAC Upgrade - 2010 |
|
01/08/10
|
6401 (53W0925) |
Paint Prairie Road Elevated Tank |
|
10/02/09
|
6400 (53W0918) |
Sanitary Sewer Point Repairs East - 2009 |
|
10/02/09
|
6399 (53W0924) |
Sanitary Sewer Point Repairs Central - 2009 |
|
09/11/09
|
6398 (53W0922) |
Northstar Park Drinking Fountain |
|
10/09/09
|
6397 (53W0921) |
Capitol Square North Parking Ramp Stair Tower Window Replacement |
|
05/28/10
|
6396 (53W0776) |
Allied Drive/ Jenewein Rd area Phase 2 |
|
Future Project
|
6395 (53W0917) |
Frey Street and Sawyer Terrace |
|
Future Project
|
6393 (53W0863) |
Hillcrest Drive Drainage Assessment District (3700 Block) |
|
08/07/09
|
6391 (53W0907) |
Woodley Lane Forcemain Replacement |
|
10/09/09
|
6389 (53W0644) |
Blackhawk Road |
|
09/04/09
|
6382 (53W0850) |
Cannonball Run Pipeline - 2009 |
|
07/10/09
|
6381 (53W0846) |
Sherman Terrace Condominiums Water Main Replacement |
|
07/17/09
|
6376 (53W0839) |
Voges Road Sewer Extension |
|
05/15/09
|
6374 (53W0837) |
Streets East Maintenance Fan Installation 2009 |
|
07/10/09
|
6373 (53W0835) |
Commercial Ave/Thompson Dr Water Main |
|
05/01/09
|
6372 (53W0790) |
Upper Badger Mill Creek Greenway Repair |
|
06/05/09
|
6370 (53W0834) |
Midvale Blvd/Waite Cir/Tokay Blvd Resurfacing 2009 |
|
Future Project
|
6369 (53W0833) |
West Streets PV Installation - 2009 |
|
04/24/09
|
6364 (53W0828) |
East Police PV Installation - 2009 |
|
08/14/09
|
6363 (53W0825) |
Veterans Memorial Park Plaza |
|
Future Project
|
6361 (53W0027) |
Rugby Row, Vista Rd, and Eton Ridge Reconstruction Assessment District - 2008 |
|
Future Project
|
6361 (53W0029) |
Fox Ave/Keyes Ave/S. Prospect Ave Reconstruction |
|
Future Project
|
6361 (53W0602) |
Chamberlain Ave/Ash St/Chestnut St/Joss Ct Reconstruction |
|
03/06/09
|
6360 (53W0656) |
Resurfacing 2009 |
|
03/27/09
|
6357 (53W0817) |
McKee Road |
|
04/09/10
|
6356 (53W0816) |
Brittingham Roof Replacement |
|
Future Project
|
6355 (53W0815) |
Park Painting - Various Locations |
|
07/31/09
|
6354 (53W0814) |
East Streets Lighting Retrofit - 2009 |
|
Future Project
|
6353 (53W0813) |
Streets Badger Vehicle Storage Annex Building |
|
Future Project
|
6351 (53W0812) |
Fire Station #2 Remodel - PH 1 Construction |
|
04/10/09
|
6350 (53W0811) |
Fairchild Building Concrete Floor Restoration |
|
06/26/09
|
6349 (53W0810) |
Fleet Services Concrete Floor Repairs |
|
09/04/09
|
6348 (53W0638) |
South Madison Branch Library Interior Building |
|
Future Project
|
6347 (53W0808) |
Fire Stations Tuckpointing |
|
05/24/09
|
6346 (53W0807) |
Olin Landfill PV Installation - 2009 |
|
06/05/09
|
6345 (53W0806) |
Warner Park Roof Repair |
|
04/23/10
|
6344 (53W0805) |
City Treasurer's Office Remodel |
|
05/15/09
|
6343 (53W0804) |
Fire Station #7 Roof Replacement |
|
03/20/09
|
6342 (53W0803) |
Parking Ramp Maintenance - 2009 |
|
06/05/09
|
6341 (53W0801) |
Littlemore Drive |
|
01/15/10
|
6340 (53W0800) |
Elizabeth Link Peace Park Redevelopment |
|
08/28/09
|
6338 (53W0798) |
Starkweather Creek Bank Improvements |
|
02/27/09
|
6337 (53W0797) |
Fairchild Building Lighting Upgrade - 2009 |
|
Future Project
|
6335 (53W0795) |
West Streets Lighting Retrofit - 2009 |
|
04/17/09
|
6334 (53W0794) |
Warning Sirens - 2009 |
|
Future Project
|
6333 (53W0732) |
Tenney Lagoon Outlet Structure |
|
03/13/09
|
6332 (53W0793) |
2009 Street Tree Installation |
|
03/06/09
|
6331 (53W0791) |
University Avenue Pavement Rehab |
|
Future Project
|
6330 (53W0370) |
Felland Neighborhood Sanitary Sewer (Phase 2) and Storm Water Management Impact Fee District |
|
08/07/09
|
6329 (53W0789) |
Lower Badger Mill Lift Station, Force Main & Sanitary Sewer |
|
03/27/09
|
6328 (53W0516) |
Alley Block 101 Reconstruction: E. Wash to E. Mifflin |
|
03/27/09
|
6328 (53W0585) |
Hudson Park Sewer Relining |
|
04/09/10
|
6327 (53W0749) |
Reiner Road Resurfacing |
|
07/02/10
|
6326 (53W0787) |
Anderson Street Sanitary Relay |
|
Future Project
|
6325 (53W0786) |
Bagley Parkway (4333) Sewer Rehabilitation |
|
09/10/10
|
6324 (53W0753) |
James Madison Park Shoreline |
|
06/18/10
|
6323 (53W0754) |
Hillcrest Upland Greenway & Sanitary Lateral Assessment District |
|
Future Project
|
6322 (53W0729) |
B. B. Clarke Shoreline Restoration |
|
08/20/10
|
6321 (53W0757) |
Sauk Creek Sewer Access Road |
|
Future Project
|
6320 (53W0788) |
Lower Badger Mill Sanitary Sewer Interceptor, Phase 1 |
|
03/13/09
|
6319 (53W0779) |
Northland Manor Park Storm Sewer |
|
03/06/09
|
6318 (53W0785) |
Park Paving - 2009 |
|
03/06/09
|
6317 (53W0784) |
Tennis Court Construction/Resurfacing - 2009 |
|
11/13/09
|
6316 (53W0780) |
Bowman / Lakeview Culvert Replacement |
|
07/10/09
|
6315 (53W0675) |
Waterways 2009 |
|
02/27/09
|
6314 (53W0783) |
Restoration Landscaping 2009 |
|
01/30/09
|
6313 (53W0781) |
Locker Room Remodel at Streets East Sycamore |
|
08/07/09
|
6312 (53W0773) |
Proudfit Street Improvements |
|
Future Project
|
6311 (53W0778) |
W. Lakelawn Place Reconstruction : ON HOLD |
|
12/05/08
|
6309 (53W0772) |
Monona Terrace Chiller Replacement 2009 |
|
Future Project
|
6308 (53W0771) |
Tenney Park Shelter |
|
03/20/09
|
6307 (53W0706) |
Sidewalk Ordered - 2009 |
|
05/22/09
|
6305 (53W0766) |
Camden Road |
|
01/23/09
|
6304 (53W0716) |
Median Landscaping 2009 |
|
01/22/10
|
6303 (53W0764) |
Old Sauk Trails Sidewalk |
|
10/29/10
|
6302 (53W0763) |
Warner Park Bleacher Reconstruction |
|
10/29/10
|
6301 (53W0760) |
Oscar Mayer Path |
|
11/06/09
|
6300 (53W0710) |
W. Gilman Street |
|
06/05/09
|
6299 (53W0758) |
Terry Place Reconstruction |
|
Future Project
|
6298 (53W0736) |
Starkweather West Branch Path |
|
02/06/09
|
6297 (53W0666) |
Spaight St. and S. Few St. Reconstruction |
|
02/06/09
|
6297 (53W0919) |
Sanitary Sewer Point Repairs West - 2009 |
|
02/20/09
|
6296 (53W0706) |
Sidewalk Ordered - 2009 |
|
03/06/09
|
6295 (53W0707) |
Sidewalk and Curb & Gutter, Citywide Installation and Repair-2009 |
|
12/26/08
|
6294 (53W0707) |
Sidewalk and Curb & Gutter, Citywide Installation and Repair-2009 |
|
04/10/09
|
6293 (53W0674) |
Sanitary Sewer Replacements with Resurfacing Assessment District - 2009 and the School Road Area Drainage Assessment District |
|
03/06/09
|
6292 (53W0656) |
Resurfacing 2009 |
|
03/06/09
|
6291 (53W0656) |
Resurfacing 2009 |
|
03/06/09
|
6290 (53W0656) |
Resurfacing 2009 |
|
03/06/09
|
6289 (53W0656) |
Resurfacing 2009 |
|
03/06/09
|
6288 (53W0718) |
Repairing & Sealing Pavement Crack, Major Streets-2009 |
|
03/06/09
|
6287 (53W0717) |
Repairing & Sealing Pavement Cracks, Local Streets - 2009 |
|
04/09/10
|
6286 (53B0765) |
Old Middleton Road |
|
05/08/09
|
6285 (53W0726) |
Oak Street and Hoard Street Reconstruction |
|
05/08/09
|
6285 (53W0759) |
Oak Street (500 Block) Assessable Drainage |
|
03/06/09
|
6284 (53W0595) |
N. Few Street Reconstruction Asssessment District-2009 |
|
Future Project
|
6283 (53W0741) |
Midvale Boulevard Pavement Rehab |
|
05/22/09
|
6282 (53W0490) |
Marquette Street |
|
04/10/09
|
6281 (53W0439) |
Maple Ave and Center Ave Ludington Ave Reconstruction |
|
06/26/09
|
6280 (53W0438) |
Lawrence Street Reconstruction |
|
02/05/10
|
6279 (53W0661) |
John Nolen Ped/Bike Path |
|
02/05/10
|
6279 (53W0888) |
John Nolen Drive Bridge Approaches |
|
03/05/10
|
6278 (53W0437) |
Division St, Helena St, Lakeland Ave and Schurz Ave Reconstruction |
|
04/10/09
|
6277 (53W0715) |
Chip Sealing 2009-West |
|
04/10/09
|
6276 (53W0714) |
Chip Sealing 2009-East |
|
03/20/09
|
6275 (53W0602) |
Chamberlain Ave/Ash St/Chestnut St/Joss Ct Reconstruction |
|
03/20/09
|
6274 (53W0713) |
Capital Square Streetscape Updates-2009 |
|
02/06/09
|
6272 (53W0026) |
Mills Street, S., Reconstruction |
|
02/20/09
|
6271 (53W0029) |
Fox Ave/Keyes Ave/S. Prospect Ave Reconstruction |
|
03/26/10
|
6270 (53W0440) |
Edgewood Avenue Reconstruction |
|
02/06/09
|
6269 (53W0733) |
University Avenue, W. Gorham Street and N. Broom Street Pavement Rehab |
|
02/20/09
|
6268 (53W0678) |
University Avenue Joint Repair & Campus Drive Pavement Rehab |
|
12/19/08
|
6267 (53W0756) |
James Madison Park Basketball Court/Parking Lot Rennovation-2009 |
|
06/05/09
|
6265 (53W0424) |
Hoepker Road Reconstruction |
|
06/05/09
|
6265 (53W0471) |
American Parkway |
|
03/19/10
|
6264 (53W0775) |
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2010 (Group A) |
|
01/09/09
|
6263 (53W0640) |
City Attorneys Ceiling Replacement |
|
09/25/09
|
6262 (53W0776) |
Allied Drive/ Jenewein Rd area Phase 2 |
|
01/23/09
|
6261 (53W0722) |
Senior Center HVAC & Lighting Upgrade, Remodeling Project |
|
Future Project
|
6259 (53W0720) |
Streets East Locker Room Remodeling Project |
|
10/31/08
|
6258 (53W0711) |
Villager IT Training Room Remodel |
|
10/10/08
|
6252 (53W0704) |
Arboretum Storm / Pond #3 Restoration, Phase 1 |
|
10/03/08
|
6250 (53W0701) |
Olbrich Boat Launch Dredging - 2008 |
|
Future Project
|
6249 (53W0698) |
S. High Point Road Sidewalk |
|
02/20/09
|
6248 (53W0695) |
Breese Stevens Field Restoration - Phase 2 |
|
08/22/08
|
6247 (53W0693) |
Fire Sprinkler Installation at Fire Station #3 and #9 |
|
08/07/08
|
6246 (53W0691) |
Unit Well 29 Water Treatment Plant Expansion |
|
09/12/08
|
6245 (53W0688) |
East Streets Maintenance Lighting Retrofit - 2008 |
|
03/27/09
|
6244 (53W0683) |
Woodward Drive Culvert Pipe Rehabilitation |
|
08/08/08
|
6243 (53W0687) |
Replace Rolling Garage Doors |
|
08/08/08
|
6242 (53W0686) |
Repaint West Transfer Point |
|
08/15/08
|
6240 (53W0679) |
Window Pane Replacement at Monona Terrace Community and Convention Center |
|
09/05/08
|
6239 (53W0677) |
Paint High Point Road Elevated Tank |
|
07/25/08
|
6234 (53W0669) |
Streets Badger Road Facility - Flooring |
|
06/20/08
|
6233 (53W0668) |
Allis Avenue Water Main Replacement Project |
|
07/11/08
|
6232 (53W0665) |
Priority Stump Removal - 2008 |
|
10/31/08
|
6231 (53W0651) |
Sycamore LF / Unit Well #29 Sentinel Well |
|
06/20/08
|
6229 (53W0647) |
STH 113 / USH 151 (East Washington Avenue) Resurfacing and Concrete Pavement Joint Repair-2008 (with Asphaltic pavement) |
|
06/20/08
|
6228 (53W0647) |
STH 113 / USH 151 (East Washington Avenue) Resurfacing and Concrete Pavement Joint Repair-2008 (with Asphaltic pavement) |
|
09/05/08
|
6227 (53W0521) |
Hiestand Park Culvert Crossing |
|
09/05/08
|
6227 (53W0663) |
Heistand Park Culvert Crossing & Path |
|
Future Project
|
6226 (53W0662) |
Heistand Park Shelter Installation |
|
07/11/08
|
6222 (53W0658) |
Warning Sirens - 2008 |
|
07/03/08
|
6220 (53W0657) |
Door Creek Park Grading - Phase I |
|
10/03/08
|
6218 (53W0628) |
Sayle Street Warehouse Building |
|
07/09/10
|
6217 (53W0650) |
Sherman Avenue Resurfacing 2010 |
|
06/06/08
|
6212 (53W0495) |
Allied Drive/ Jenewein Rd area Phase 1 |
|
04/04/08
|
6211 (53W0647) |
STH 113 / USH 151 (East Washington Avenue) Resurfacing and Concrete Pavement Joint Repair-2008 (with Asphaltic pavement) |
|
03/21/08
|
6210 (53W0643) |
Demetral Landfill PV Installation |
|
03/21/08
|
6209 (53W0642) |
Greentree Landfill PV Installation |
|
05/23/08
|
6208 (53W0555) |
Sanitary Sewer Replacement with Resurfacing Central Assessment District 2008 |
|
03/21/08
|
6201 (53W0632) |
Street Tree Installation - 2008 |
|
03/14/08
|
6199 (53W0496) |
Resurfacing 2008 |
|
Future Project
|
6198 (53W0630) |
2008-2010 Semi-Permanent (Epoxy) Pavement Markings |
|
03/14/08
|
6197 (53W0629) |
CIPP Rehab of Sanitary Sewers - 2008 |
|
Future Project
|
6196 (53W0619) |
MMB Electrical System Upgrades |
|
08/22/08
|
6195 (53W0622) |
Fire Station #5 Remodel - Phase II |
|
06/20/08
|
6194 (53W0621) |
Fire Station #12 |
|
Future Project
|
6193 (53W0620) |
Fairchild Stairwell and Tuckpointing at Fairchild and MMB |
|
03/21/08
|
6191 (53W0623) |
Alicia Ashman Library PV Installation - 2008 |
|
Future Project
|
6190 (53W0626) |
Capital Square North and Lake Ramp Painting - 2008 |
|
05/09/08
|
6189 (53W0625) |
CCB Central District Police Remodel - Phase 4 |
|
06/06/08
|
6188 (53W0628) |
Sayle Street Warehouse Building |
|
07/18/08
|
6187 (53W0627) |
Streets West Roof Replacement 2008 |
|
07/18/08
|
6187 (53W0709) |
Olin Transfer Station Roof Replacement 2008 |
|
Future Project
|
6186 (53W0598) |
Tradewinds Parkway Extention |
|
03/14/08
|
6185 (53W0597) |
2008 Parking Ramp Maintenance |
|
03/21/08
|
6184 (53W0594) |
Parkland Grading/Seeding - 2008 |
|
03/14/08
|
6183 (53W0592) |
Tennis Court Resurfacing/Reconstruction - 2008 |
|
Future Project
|
6182 (53W0574) |
Seybold Road Reconstruction |
|
02/15/08
|
6181 (53W0591) |
Building Demolition at 17 - 19 South Orchard Street |
|
08/20/10
|
6180 (53W0590) |
East Towne / Starkweather Greenway |
|
09/05/08
|
6179 (53W0311) |
Wingra Creek Parkway Improvements, Phase 2 |
|
Future Project
|
6178 (53B0903) |
Hudson Park Shoreline |
|
10/03/08
|
6177 (53W0560) |
Glenway / Forest Hills Greenway Improvement |
|
05/08/09
|
6176 (53W0258) |
Wingra Dam Rehabilitation |
|
Future Project
|
6175 (53W0369) |
Pumpkin Hollow Sanitary Sewer and Stormwater Management Impact Fee District |
|
01/30/09
|
6174 (53W0578) |
Starkweather Creek BMP's - 2008 |
|
Future Project
|
6173 (53W0589) |
Richard / Cumberland Relief Storm Sewer |
|
09/12/08
|
6172 (53W0588) |
Ravine Street Arch Culvert Rehab |
|
04/25/08
|
6171 (53W0543) |
Waterways 2008 |
|
07/03/08
|
6170 (53W0410) |
Eastmorland Park Drainageway Assessment District & Eastmorland Bike Path Reconstruction |
|
Future Project
|
6169 (53W0587) |
Warner Park Sediment Trap |
|
03/21/08
|
6168 (53W0586) |
Restoration Landscaping 2008 |
|
08/07/09
|
6167 (53W0575) |
Elderberry Neighborhood Sewer Interceptor Extension |
|
05/30/08
|
6166 (53W0577) |
Lake Mendota Drive (5300 Block) Assessable Sewer Relocation |
|
Future Project
|
6165 (53W0584) |
Acewood Pond Outlet Repair |
|
03/20/09
|
6164 (53W0583) |
Northeast Neighborhood Sewer Interceptor Extension - 2008 |
|
Future Project
|
6163 (53W0582) |
School Road (3800 to 4000 block) Assessable Drainage Improvement |
|
01/08/10
|
6162 (53W0532) |
Bike Paths, 2009 |
|
01/09/09
|
6161 (53W0581) |
North Police HVAC Retrofit - 2009 |
|
02/22/08
|
6160 (53W0580) |
Park Paving - 2008 |
|
01/18/08
|
6159 (53W0576) |
Well 3 Abandonment |
|
Future Project
|
6158 (53W0189) |
Portage Road / Hanson Road Bridge over I 39/90/94 |
|
01/11/08
|
6153 (53W0407) |
Gettle Avenue Lift Station Rehabilitation |
|
12/07/07
|
6152 (53W0570) |
MMB Elevator Modernization |
|
04/04/08
|
6151 (53W0555) |
Sanitary Sewer Replacement with Resurfacing Central Assessment District 2008 |
|
04/04/08
|
6151 (53W0682) |
Carroll Street Forcemain Emergency Repair |
|
02/08/08
|
6150 (53W0554) |
Sanitary Sewer with Resurfacing - 2008 East |
|
11/16/07
|
6149 (53W0566) |
Fire Station Lighting Retrofit 2008 |
|
02/08/08
|
6148 (53W0567) |
Sequoya Branch Library Interior Building Improvements |
|
12/28/07
|
6147 (53W0565) |
Carpet Replacement at South Madison Health and Familty Center, Harambee |
|
04/04/08
|
6144 (53W0562) |
Capitol Square Streetscape Updates - 2008 |
|
03/20/09
|
6143 (53W0432) |
W. Gilman Street Reconstruction |
|
Future Project
|
6142 (53W0542) |
Segoe Road/Sheboygan Ave Intersection Improvement |
|
05/09/08
|
6141 (53W0027) |
Rugby Row, Vista Rd, and Eton Ridge Reconstruction Assessment District - 2008 |
|
04/04/08
|
6140 (53W0436) |
Riverside Drive and Yahara Place Reconstruction Assessment District - 2008 |
|
02/08/08
|
6139 (53W0535) |
Repairing & Sealing Pavement Cracks, Major Streets-2008 |
|
02/08/08
|
6138 (53W0534) |
Repairing & Sealing Pavement Cracks, Local Streets-2008 |
|
07/03/08
|
6136 (53W0423) |
Old Sauk Road Reconstruction |
|
04/04/08
|
6135 (53W0474) |
South Sprecher Road Assessment District - 2008 |
|
05/28/10
|
6134 (53W0545) |
Mineral Point Road/Owen Dr Intersection Improvement |
|
06/18/10
|
6133 (53W0499) |
Cannonball Bike Trail, Military Ridge Trail Extension |
|
12/05/08
|
6132 (53W0021) |
Marston Avenue Reconstruction |
|
06/20/08
|
6131 (53W0500) |
Bram Street Viaduct Improvements |
|
11/07/08
|
6130 (53W0533) |
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2009 (Group A) |
|
04/04/08
|
6129 (53W0017) |
Jenifer Street and Livingston Street Reconstruction Assessment District - 2008 |
|
04/25/08
|
6128 (53W0020) |
Jean St/Leitch Ct Reconstruction |
|
04/25/08
|
6128 (53W0559) |
N. Pinckney Street Reconstruction |
|
07/09/10
|
6126 (53W0649) |
Hanson Road Resurfacing |
|
06/06/08
|
6125 (53W0171) |
South Few Street and South Baldwin Street Reconstruction District - 2008 |
|
11/12/10
|
6124 (53W0264) |
Fair Oaks/Atwood Ave pavement rehab |
|
03/14/08
|
6123 (53W0435) |
E. Main St and N. Dickinson St Reconstruction |
|
05/21/10
|
6122 (53W0497) |
Country Grove/Chavez Ped Bridge and Path |
|
02/08/08
|
6121 (53W0547) |
Concrete Pavement Rehab-2008, Mineral Point Road & S. Gammon Rd |
|
05/09/08
|
6120 (53W0537) |
Chip Sealing 2008-West |
|
05/09/08
|
6119 (53W0538) |
Chip Sealing 2008-East |
|
03/05/10
|
6118 (53W0553) |
Bridge Maintenance & Repairs 2010 |
|
01/23/09
|
6117 (53W0552) |
Arbor Dr/Knickerbocker St/Pickford St Resurfacing & Sewer Replacement |
|
04/17/08
|
6116 (53W0471) |
American Parkway |
|
12/21/07
|
6112 (53W0324) |
Siggelkow Road |
|
11/16/07
|
6111 (53W0561) |
Reroofing of Fire Stations 2 and 5 |
|
11/02/07
|
6110 (53W0558) |
Fire Lighting Retrofit 2007 |
|
Future Project
|
6109 (53W0546) |
Herndon Drive (See 53B2171-Sprecher Road Estates) |
|
04/18/08
|
6108 (53W0551) |
E. Gorham Street Resurfacing & Sanitary Sewer Replacement |
|
05/23/08
|
6107 (53W0550) |
Sherman Avenue Resurfacing |
|
01/25/08
|
6105 (53W0549) |
Sachs St Reconstruction & N. Marquette St Sanitary Replacement |
|
03/26/10
|
6104 (53B0790) |
Lien Road Reconstruction |
|
02/22/08
|
6103 (53W0526) |
Sidewalk and Curb & Gutter, Citywide Installation and Repair-2008 |
|
03/14/08
|
6100 (53W0525) |
Sidewalk Ordered - 2008 |
|
03/14/08
|
6099 (53W0496) |
Resurfacing 2008 |
|
03/14/08
|
6098 (53W0496) |
Resurfacing 2008 |
|
03/14/08
|
6097 (53W0496) |
Resurfacing 2008 |
|
03/14/08
|
6094 (53B0951) |
Forest Street (300 Block) Drainage Assessment District |
|
03/14/08
|
6094 (53W0433) |
Kendall Ave/Chestnut St/Walnut St Reconstruction |
|
09/28/07
|
6092 (53W0316) |
Urban Best Management Practices |
|
10/12/07
|
6091 (53W0530) |
Transit Garage Vertical Lifting Door Including Installation |
|
10/12/07
|
6090 (53W0509) |
Solar Water Heating - FS#1 |
|
10/12/07
|
6090 (53W0510) |
Solar Water Heating - FS#2 |
|
10/12/07
|
6090 (53W0511) |
Solar Water Heating - FS#5 |
|
10/12/07
|
6090 (53W0512) |
Solar Water Heating - FS#6 |
|
10/12/07
|
6090 (53W0513) |
Solar Water Heating - FS#9 |
|
10/12/07
|
6090 (53W0514) |
Solar Water Heating - FS#10 |
|
10/12/07
|
6090 (53W0515) |
Solar Water Heating - FS#11 |
|
09/21/07
|
6089 (53W0523) |
Repair at the Capitol Square North, Government East, and State Street Campus (Lake) Parking Ramps |
|
12/28/07
|
6088 (53W0434) |
Waubesa Street Reconstruction |
|
01/11/08
|
6087 (53W0520) |
Fleet Service Bldg Mechanical, Fire Protection, Plbg and Bldg Security Modifications |
|
08/10/07
|
6085 (53W0492) |
Southeast Industrial TID Sewer Interceptor |
|
08/10/07
|
6084 (53W0506) |
Spring Court Water Main Replacement |
|
08/24/07
|
6083 (53W0504) |
Fire Sprinkler Installation at Fire Stations 1,3 & 5 |
|
08/31/07
|
6082 (53W0456) |
Fire Station #1 Lighting Upgrade |
|
08/24/07
|
6081 (53W0503) |
Paterson Materials Handling Bldg |
|
10/26/07
|
6080 (53W0502) |
CCB/MMB Tenant Improvement Remodels PH 2 |
|
09/21/07
|
6078 (53W0501) |
2007 City of Madison Conduit Installations |
|
02/22/08
|
6077 (53W0526) |
Sidewalk and Curb & Gutter, Citywide Installation and Repair-2008 |
|
07/06/07
|
6076 (53W0491) |
Center for Industry and Commerce: Manufacturers Drive |
|
05/25/07
|
6071 (53W0527) |
Lexington Av Water Main Replacement |
|
10/12/07
|
6069 (53W0415) |
Waubesa / St. Paul Relief Storm Interceptor |
|
06/08/07
|
6068 (53W0481) |
Reroof Traffic Engineering Building Unit B |
|
06/08/07
|
6067 (53W0482) |
Reroof East Side Public Works Maintenance Facility |
|
04/25/07
|
6064 (53B0999) |
Lien Road Partial Reconstruct |
|
05/25/07
|
6063 (53W0477) |
Remodel Fire Station #5 |
|
08/10/07
|
6061 (53W0475) |
2007 Warning Sirens |
|
09/28/07
|
6058 (53W0314) |
Kettle Pond Dredging |
|
07/06/07
|
6057 (53W0313) |
Owen Park Retention Ponds |
|
06/08/07
|
6053 (53W0315) |
Seminole Storm Sewer Reroute |
|
08/10/07
|
6044 (53W0508) |
Breese Stevens Field Restoration-2007 |
|
08/10/07
|
6043 (53W0354) |
Truax Area Sanitary Sewer Rehabilitation |
|
07/06/07
|
6040 (53B0959) |
Westmorland Park Greenway |
|
08/10/07
|
6039 (53W0507) |
Sign Shop HVAC Modifications |
|
03/16/07
|
6038 (53W0454) |
Restoration Landscaping 2007 |
|
08/28/09
|
6035 (53W0532) |
Bike Paths, 2009 |
|
03/23/07
|
6034 (53W0450) |
Sycamore East Side Public Works Garage - Lighting Retrofit |
|
06/08/07
|
6030 (53W0024) |
Adams St and Harrison St Reconstruction |
|
06/08/07
|
6029 (53W0348) |
Frontage Road Removal |
|
09/21/07
|
6028 (53W0223) |
Clyde Gallager Av Reconstruction & Starkweather Streambank Stabilization, PH 2005 |
|
06/08/07
|
6027 (53B0877) |
Regent Street Reconstruction |
|
06/08/07
|
6027 (53W0338) |
Regent Street Reconstruct (Assess. Streets fund) |
|
07/10/09
|
6026 (53B0462) |
Femrite Drive Resurfacing |
|
06/29/07
|
6025 (53W0335) |
Spaight Street, Russell St and Walton Pl Reconstruction |
|
05/25/07
|
6024 (53W0444) |
Gammon Lane Reconstruction |
|
05/04/07
|
6022 (53W0015) |
Chamberlain Avenue Reconstruction |
|
05/04/07
|
6022 (53W0334) |
Kendall Avenue Reconstruction |
|
04/20/07
|
6021 (53W0336) |
Hoard Street, Upham Street, N. Sixth Street Reconstruction (and 5th St, 6th St resurfacing) |
|
04/06/07
|
6020 (53W0016) |
Colby Street Reconstruction |
|
04/06/07
|
6020 (53W0451) |
Livingston Street, South |
|
04/06/07
|
6019 (53W0025) |
Mifflin Street, E. Reconstruct & Blount St, N. Resurface |
|
07/06/07
|
6018 (53W0307) |
Mayfair Avenue Reconstruction |
|
03/28/07
|
6017 (53W0002) |
Far West Storm Water Management - Confluence Pond |
|
03/28/07
|
6017 (53W0044) |
Todd Dr. &. W. Beltline Frontage Road Reconstruction / USH 12 S. Beltline Resurfacing |
|
03/28/07
|
6017 (53W0119) |
High Point Road, S. and Raymond Road |
|
03/28/07
|
6017 (53W0426) |
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2007 |
|
Future Project
|
6015 (53W0395) |
Yesterday Drive |
|
04/20/07
|
6014 (53W0442) |
Concrete Pavement Rehab, University Ave. |
|
05/04/07
|
6013 (53W0443) |
Concrete Pavement Rehab, Mineral Point Road |
|
02/23/07
|
6012 (53W0428) |
Repairing&Sealing Pavement Cracks, Major Sts.-2007 |
|
02/23/07
|
6011 (53W0427) |
Repairing&Sealing Pavement Cracks,Local Sts.-2007 |
|
02/23/07
|
6010 (53W0431) |
Chip Seal 2007 District 7 |
|
02/23/07
|
6009 (53W0430) |
Chip Seal 2007 District 3 |
|
Future Project
|
6008 (53W0383) |
Winnebago St and Buell St Reconstruction |
|
Future Project
|
6007 (53W0170) |
City View Drive (new street) |
|
08/10/07
|
6006 (53W0387) |
Union Corners - Winnebago Street Phase 2 |
|
07/06/07
|
6005 (53W0400) |
Edgewood Drive Resurfacing |
|
07/17/07
|
6004 (53W0401) |
John Nolen Dr/ Wilson St/ Blair St/ Williamson St Intersection |
|
05/04/07
|
6003 (53B0878) |
Bedford Street, S.(recon) and W. Main Street (resurface) |
|
04/06/07
|
6002 (53W0022) |
Garrison St/Lindbergh St/Buena Vista St Reconstruction |
|
04/06/07
|
6002 (53W0023) |
Dixon St/Fairview Ave/Ryan St Reconstruction |
|
06/08/07
|
6001 (53W0426) |
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2007 |
|
12/07/07
|
6000 (53W0189) |
Portage Road / Hanson Road Bridge over I 39/90/94 |
|
03/09/07
|
5999 (53W0445) |
Park Street Reconstruction (southbound lanes only) and construction of Relief Storm Sewer |
|
07/06/07
|
5998 (53W0446) |
Park St and Hughes Place Intersection |
|
03/16/07
|
5997 (53W0401) |
John Nolen Dr/ Wilson St/ Blair St/ Williamson St Intersection |
|
03/16/07
|
5997 (53W0417) |
Sidewalk and Curb & Gutter, Citywide Installation and Repair-2007 |
|
04/20/07
|
5996 (53W0416) |
Sidewalk Ordered - 2007 |
|
02/23/07
|
5995 (53W0416) |
Sidewalk Ordered - 2007 |
|
03/16/07
|
5994 (53W0403) |
Resurfacing 2007 |
|
03/16/07
|
5993 (53W0403) |
Resurfacing 2007 |
|
03/16/07
|
5992 (53W0403) |
Resurfacing 2007 |
|
03/09/07
|
5991 (53W0371) |
University / Highland Intersection Flooding |
|
04/06/07
|
5990 (53W0386) |
Sanitary Sewer Replacements w/Resurfacing-2007 |
|
05/25/07
|
5989 (53W0409) |
Waterways - 2007 |
|
02/23/07
|
5987 (53B0694) |
Mifflin Street, W. Reconstruction |
|
01/18/07
|
5986 (53W0455) |
CCB Tenant Improvement Remodels, Phase 1 |
|
11/02/07
|
5982 (53W0123) |
State Street Reconstruction |
|
11/02/07
|
5982 (53W0562) |
Capitol Square Streetscape Updates - 2008 |
|
11/27/06
|
5973 (53B0999) |
Lien Road Partial Reconstruct |
|
07/14/06
|
5967 (53W0349) |
Woodrow Street, Edgewood Drive |
|
07/14/06
|
5966 (53W0379) |
Mineral Point Road at Junction Road |
|
07/28/06
|
5965 (53W0353) |
Sanitary Sewer Relining and Rehabilitation - 2006 |
|
06/30/06
|
5964 (53W0378) |
Gammon Rd pavement repairs |
|
06/23/06
|
5962 (53W0376) |
University Ave pavement repairs |
|
06/23/06
|
5959 (53W0363) |
Hawks Ridge Estates Sanitary Sewer Assessment District |
|
06/02/06
|
5957 (53W0368) |
Chip Seal 2006 District 20 |
|
07/28/06
|
5956 (53W0366) |
Warning sirens - 2006 |
|
05/26/06
|
5955 (53W0365) |
Raymond Road Confluence Pond Culvert |
|
07/07/06
|
5953 (53W0294) |
Union Corners, Winnebago Street |
|
03/24/06
|
5952 (53W0359) |
3054 E. Washington Ave Demolition |
|
03/17/06
|
5942 (53W0318) |
Sidewalk Ordered 2006 |
|
07/07/06
|
5940 (53W0331) |
Yahara River Parkway 2006 |
|
10/24/08
|
5939 (53B0965) |
Buckeye Extension of Capital City Trail |
|
07/13/07
|
5937 (53W0325) |
Bridge Repairs 2007 |
|
06/09/06
|
5936 (53W0337) |
Hoard St, Upham St and Seventh St Reconstruction |
|
11/27/06
|
5935 (53W0256) |
High Point Rd, S. Reconstruction |
|
05/26/06
|
5933 (53W0332) |
Marsh Road Reconstruction |
|
07/06/07
|
5932 (53W0351) |
Rethke Avenue Reconstruction |
|
11/27/06
|
5931 (53B0691) |
Chandler St., S. Charter St. & S. Orchard St. Reconstruct |
|
12/22/06
|
5930 (53W0039) |
Castle Place Reconstruction |
|
04/21/06
|
5929 (53B0879) |
Mifflin St and Seventh St Reconstruction |
|
04/21/06
|
5928 (53W0320) |
Struck Street |
|
06/02/06
|
5927 (53W0352) |
Chip Seal 2006 District 18 |
|
06/08/07
|
5926 (53W0344) |
Capital Square Repair & Bus Shelters |
|
03/24/06
|
5925 (53B0672) |
Waterways 2001 |
|
03/24/06
|
5925 (53W0292) |
Harrison Street, West Lawn Ave, Monroe Street Reconstruction |
|
10/03/08
|
5923 (53B0674) |
Olbrich Park Shoreline Repair |
|
04/14/06
|
5920 (53W0356) |
Restoration / Landscaping 2006 |
|
04/21/06
|
5919 (53W0014) |
Edgewood Ave Reconstruct |
|
05/05/06
|
5918 (53W0310) |
Waterways 2006 |
|
02/03/06
|
5917 (53W0343) |
902 Magnolia Lane |
|
03/31/06
|
5916 (53W0304) |
Midvale Storm Sewer Replacement-2006 |
|
03/31/06
|
5916 (53W0316) |
Urban Best Management Practices |
|
03/31/06
|
5916 (53W0414) |
Railings, E. Johnson Underpass & Southwest Bike Path |
|
03/24/06
|
5915 (53W0298) |
Sanitary Sewer Replacements with Resurfacing-2006 |
|
03/10/06
|
5912 (53W0230) |
Capital Square Joint Repair 2006 |
|
02/10/06
|
5910 (53W0329) |
Repairing&Sealing Pavement Cracks, Major Sts.-2006 |
|
02/10/06
|
5909 (53W0328) |
Repairing&Sealing Pavement Cracks,Local Sts.-2006 |
|
03/10/06
|
5908 (53W0326) |
Resurfacing 2006 |
|
03/10/06
|
5907 (53W0326) |
Resurfacing 2006 |
|
03/10/06
|
5906 (53B1930) |
Twin Oaks |
|
03/10/06
|
5906 (53W0326) |
Resurfacing 2006 |
|
03/24/06
|
5905 (53W0319) |
Sidewalk Request 2006 |
|
05/26/06
|
5904 (53W0318) |
Sidewalk Ordered 2006 |
|
03/10/06
|
5903 (53W0318) |
Sidewalk Ordered 2006 |
|
01/20/06
|
5900 (53W0303) |
West Beltline Frontage Road / Todd Drive Reconstruction |
|
02/24/06
|
5899 (53W0122) |
State Street Reconstruction |
|
02/24/06
|
5899 (53W0421) |
John Nolen Drive bridge over Wingra Creek |
|
05/26/06
|
5896 (53W0323) |
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2006 |
|
09/22/06
|
5889 (53B0974) |
Wingra Creek Parkway Improvements - Phase 1 |
|
11/16/07
|
5840 (53W0246) |
Wingra Park Shoreline and Dredging |
|
01/25/08
|
5836 (53W0245) |
Felland Neighborhood Sewer Assessement District |
|
05/26/06
|
5812 (53B0690) |
Randall Avenue, S. |
|
Future Project
|
5811 (53W0231) |
Mineral Point Road-Junction Road |
|
08/04/06
|
5810 (53B0999) |
Lien Road Partial Reconstruct |
|
06/08/07
|
5806 (53W0211) |
Bike Paths, 2007 |
|
01/06/06
|
5792 (53W0222) |
Interstate Commerce Park: Phase I |
|
03/14/08
|
5788 (53W0009) |
Monroe St & Little St &Randall Ave & Randall Ct Resurfacing (reconstruct Randall Ct) |
|
05/25/07
|
5783 (53W0198) |
Delaplaine Ct, S. Brooks St, Erin St., S. Park St |
|
12/19/08
|
5619 (53W0033) |
Troy Drive Sidewalk |
|
11/03/06
|
5613 (53W0057) |
Cottage Grove Road Bike Lanes |
|
04/20/07
|
5610 (53W0003) |
Coldspring Avenue Reconstruction |
|
05/05/06
|
5604 (53B0687) |
Dunning St, Lakeland Ave, Schiller Ct |
|
03/28/07
|
5500 (53W0002) |
Far West Storm Water Management - Confluence Pond |
|
04/20/07
|
5473 (53B0094) |
Sherman Flyer: Segment 1 Bike Path |