Alder Harrington-McKinney’s Updates

Happy 4th of July!

July 4, 2018 7:03 PM

 

Many have asked for construction updates. Enjoy the day, remember

to stay well hydrated. 

Park Edge/Park Ridge Neighborhood Employment & Training Center 

Per ADDM #1: Pre-Bid Contractors Meeting: Tuesday, June 26, 2018 @ 1:30 pm at 1233 McKenna Blvd. Madison WI (Former Griff's Restaurant). Seven contractors came out for the pre-bid walk through.

Status: BIDDING

1st Advertisement of Bid: June 08, 2018 Documents available on Bid Express.

Bid Due: Thursday, July 19, 2018 @ 2:00 pm

Construction Start: August 31, 2018

Expected Completion: Feb. 27, 2019

SBE Pre-Bid Meeting: July 06, 2018 1:00 pm at 1600 Emil St., Madison, WI

"All information regarding dates/times/locations are informational and should be verified with official bidding documents posted on Bid Express."

The City purchased the former Griff's Restaurant near Elver Park on McKenna Blvd. to be renovated for an adult and youth oriented employment services center. The City and the center's operator, Urban League of Greater Madison (ULGM), have collaborated on four well-attended public meetings to collect information from neighborhood residents on desired training and programs to be offered and building design.  At just under 4,000 square feet, the building will feature a large, dividable meeting room with attached kitchen, computer lab, self-serve computer kiosks, staff area and restrooms.  The exterior siding and roofing materials will be replaced. ULGM is currently staffing a temporary location to get training and programs up and running in the neighborhood. City User Agency: Community Development Division

1st Advertisement of Bid: June 08, 2018 Documents available on Bid Express

Project Details

Project Type: City Facilities

Location(s): 

1233 McKenna Blvd

Madison, WI 53716

Area: South, West

Aldermanic District(s): District 1

Contract Number: 8213

Project Status: Bidding

Project Contact: 

    Jeanine Zwart

608/267-8749

 

Park Edge Drive Flood Mitigation

Project Description:

City Engineering is upgrading the storm mains at the intersection of Park Edge Dr and Park Ridge Dr which flow through a public easement at 6741 Park Edge Dr. This project will involve the upsizing of street inlets, relocation of the upgraded storm main and repaving approximately 100 feet of Park Edge Dr. Storm main will be relocated from the existing location within an easement between the condominiums at 6741 Park Edge Dr and through a new easement within the south driveway of 6741 Park Edge Dr and connect to the adjacent Stormwater Utility property (Greentree) to the east.

 

A section of Park Edge Dr, from 6702 Park Edge Dr to the south driveway of 6741 Park Edge Dr, may be closed for a period of 7 days. Contractors will work to maintain access.

Plans for the project can be found :

http://www.cityofmadison.com/business/pw/contracts/documents/8035_10032017.pdf PDF 

 

City of MadisonEngineeringProjectsMcKenna Blvd/Gammon Ln Flood Mitigation Project

 

McKenna Blvd/Gammon Ln Flood Mitigation Project

Last Updated: 06/21/2018

The east Park Edge Dr neighborhood consists of several cul-de-sacs that back the City of Madison's West Badger Mill Creek - Elver Park Greenway. That greenway carries water from Greentree Pond north of the neighborhood and discharges via pipes under McKenna Blvd to Elver Park. The associated watershed is approximately 1.4 square miles in area, and drains from north to south.

 

Since 2016, Park Edge Dr residents have noted several rain events in which water from the greenway flooded the neighborhood and entered their structures. Additionally, McKenna Blvd, which is a main thoroughfare through the neighborhood and houses police and fire stations for the west side, has overtopped and become impassible several times. As such, City Engineering is proposing a public works improvement to fix this issue. The City is looking at design options, which may include a project that would lower the overflow elevation in Elver Park, which should reduce flooding in the Park Edge neighborhood and lower the flood elevation on McKenna Blvd itself. The potential design could include some road work along McKenna Blvd and parking lot reconstruction and grading in Elver Park.

Project Details

Project Type: Road Construction, Sewer/Storm

Location(s): 1250 McKenna Blvd. Madison, WI 53719. Area: West

Aldermanic District(s): District 1

Project Status: In Design Project Contact: Lauren Striegl. 608-266-4094

lstriegl@cityofmadison.com

 

 Hawks Landing Flood Mitigation

Project Background

Hawks Landing is a residential development located on the far west side of Madison at the northwest quadrant of South Pleasant View Road (CTH 'M') and Midtown Road. Construction of the development began in 2001. The development includes approximately 300 homes and an 18-hole golf course, the Hawks Landing Golf Club.

Hawks Landing has six (6) stormwater control ponds, all located within the golf course. Three of these ponds (LBMC North, LBMC SW, and LBMC East Ponds) are located on the west side of the course and drain to Lower Badger Mill Creek (LBMC), and three (UBMC North, UBMC SE, and UBMC SW Ponds) are located on the east side and drain to Upper Badger Mill Creek (UBMC).

Project Description

The west side of the development, as shown in Map 1 PDF 

This PDF will open in a new window.

, experiences drainage problems during large storm events. Lots 169, 170, and 250 experience flooding during events, with the highest water levels and highest flows occurring on Lot 170. In September 2016, the City contracted with MSA Professional Services, Inc. to conduct a drainage study for the western portion of Hawks Landing, the area roughly bounded by Eaglewood Drive on the north, Breezy Trail on the east, Mid Town Road on the south, and Shady Point Drive on the west. Map 2 PDF 

This PDF will open in a new window.

identifies shows the delineated watersheds and the general flow directions for the study area. Note that, for the purposes of this project, the ponds shown in Map 2 have been assigned alphabetic identifiers:

LBMC SW Pond (Map 1) = Pond C (Map 2)

LBMC North Pond (Map 1) = Pond D (Map 2)

LBMC East Pond (Map 1) = Pond E (Map 2)

Flooding downstream from Pond C is due in part to observed plugging of the pond outlet structure; however, significant additional contributors to flooding are discharges from upstream ponds (Ponds D&E on Map 2) which appear to be much greater than originally planned. The City of Madison is currently working with Hawks Landing Golf Course to design and construct additional detention on the golf course upstream of Pond C to minimize flows out of that pond into the neighborhood. The City of Madison also intends to modify Pond C's outlet to minimize clogging during future events. When completed, these designs and associated construction schedules will be posted to this website.

 

In addition to Hidden Hill Dr and Shady Point Dr, flooding occurs in the north part of the neighborhood as well, north of intersection of Hill Creek Dr and Grassy Hollow Dr. This flooding is due in large part to runoff from the undeveloped farm field north of the Hawks Landing neighborhood. The City has contracted with MSA Professional Services, Inc. to investigate solutions to this flooding problem.

Project Details

Project Type: Road Construction, Sewer/Storm

Location(s): 1807 Hidden Hill Drive, Verona, WI 53593. Area: West

Aldermanic District(s): District 1

Estimated Schedule: 07/02/2018 to 12/01/2018

Project Status: In Design

Project Contact: Lauren Striegl. 608-266-4094

lstriegl@cityofmadison.com

 

Gammon Road, S. and West Towne Path

Update - Public information meeting scheduled for June 27, 2018 - see details below.

 

Project Description:

The City of Madison in conjunction with the Wisconsin Department of Transportation is proposing a street reconstruction project on South Gammon Road from Seybold Road to Mineral Point Road and construction of a shared-use path, known as the West Towne Path, from Grand Canyon Drive to Junction Road within the City of Madison. 

 

There are multiple phases of construction planned for the project.  The first phase of the project includes reconstruction of South Gammon Road and construction of the shared use-path from the Struck Street pedestrian underpass of the Beltline to the west side of South Gammon Road. This phase includes construction of a pedestrian underpass of Gammon Road.  Construction of phase one of the project is planned to take place in 2020.  Later phases of construction will include construction of the shared-use path from the west side of Gammon Road to Junction Road. The later phases of construction will include construction of a pedestrian underpass of Watts Road.  The year of construction for the later phases of the project will be determined as funding becomes available.   The reconstruction of South Gammon Road will consist of the replacement of the roadway base course, curb and gutter and concrete pavement with spot repairs of the concrete sidewalk. Public utilities, including sanitary sewer, storm sewer and water main will also be replaced as necessary with the project.  Upgrades will also be made to the street lighting and traffic signal systems.

 

Construction of the shared-use, West Towne Path will consist of an asphalt path, 10-feet wide, with 2-foot grass shoulders, to accommodate two-way bicycle traffic, pedestrians and other non-motorized users.

The West Towne Path will provide an east-west connection for non-motorized users from the Junction Road (CTH M) to the West Town Mall area and to the near west side of Madison. 

 

Project Schedule:

Phase 1 (Gammon Road and West Towne Path from Struck to Gammon): Construct in 2020

Phase 2 (West Towne Path from Gammon to Junction): Construction year to be determined.

 

Public Meetings:

Public Information Meeting - June 27, 2018

There will be a public involvement meeting held for the project on Wednesday, June 27, 2018 at the Lussier Community Education Center, 55 S. Gammon Road, Madison, WI from 6:00 P.M. to 8:00 P.M. There will be a brief presentation at 6:00 P.M. The purpose of the meeting is to introduce the proposed conceptual design, intersection alternatives, and multi-use path alternatives; answer questions; and listen to your comments, concerns, or suggestions. City Staff and design Consultants will be available to answer questions. This is an opportunity for the public to offer input into the design process.

 

Project Details

Project Type: Bike, Road Construction. Location(s): 530 South Gammon Road

Madison, WI. Area: West

Aldermanic District(s): District 1, District 9, District 19

Impact: Major

Project Status: In Design. Project Contact: Glen Yoerger. 608-261-9177

 

County Highway M 

Prairie Hill to Cross Country - Construction Update

Public Information Meetings - Construction Phase

 

Monthly Project Meeting - Thursday, July 5, 3:00 p.n.

WisDOT, City of Madison, City of Verona & Dane County will host monthly project meetings open to the public to get updates on the schedule and ask questions.  This is an opportunity for property owners, residents and businesses to ask questions to the contractor and project staff.  The meetings will be held on the first Thursday of every month during construction at 3:00 pm.  The meetings are located at the Epic Annex located off of Northern Lights Drive in Verona, WI

 

General Project Information –

The reconstruction of CTH M includes earthwork, storm sewer, sanitary sewer, water main, base aggregate, concrete curb and gutter, concrete sidewalk, HMA pavement, Structures B-13-845, retaining walls, street lighting, traffic signals. The overall work is scheduled for completion on November 1, 2019 with several interim completion dates.

Project Schedule:

Stage: Stage 2- work consists of roadway and structure construction on Raymond Road, CTH M, CTH PD, Mid Town Road, and additional side roads throughout the project limits. Multiple work operations will be taking place on both sides of CTH M, CTH PD, and Mid Town Road.

A traffic switch on CTH PD to Stage 2B is tentatively scheduled for Wednesday, July 11, 2018.

The traffic pattern on CTH M will remain in the Stage 2 configuration until further notice. Raymond Road will remain closed to thru traffic until further notice. One lane of traffic in each direction will be maintained on CTH M, CTH PD, and Mid Town Road on the existing travel lanes during peak travel times.

Roadway flagging operations will be taking place periodically throughout Stage 2 between the hours of 9am and 3pm and overnight between 7pm and 6am. Temporary weekend roadway closures of CTH M and CTH PD will be allowed, however, are not anticipated at this time. Advanced notification of the closures will be provided. Please be alert when traveling the CTH corridor.

Crews will continue survey and layout operations.

Crews will continue Stage 2 storm sewer, watermain, and sanitary sewer installations. Crews will continue Stage 2 grading and complete surcharge operations. Crews will continue electrical installations on Meriter Way, Wellness Way, CTH PD, and CTH M. Crews will continue bridge construction at the CTH PD and CTH M intersection. Crews will continue construction of the pedestrian underpass, C-13-2080, near Flagstone Drive and work on retaining wall R-13-292. Crew will begin pile driving operations on Pier 1 at the B-13-0845 structure.

 

Work scheduled for the next week (week of 07/09/18): 

Crews will continue storm sewer installation along CTH M in the Stage 2 limits. Crews will continue watermain and sanitary sewer work throughout the project.

Crews will continue Stage 2 grading and surcharge operations.

Crews will continue bridge construction at the CTH PD and CTH M intersection and continue pile driving operations on Pier 1. 

Crews anticipate beginning work on R-13-293, just south of the pedestrian underpass. Crews anticipate beginning construction on structure C-13-2081.

Crews anticipate beginning temporary shoring installations on structures C-13-2083 and C-13-2085. Crews will continue electrical installations throughout the project.  Crews are anticipated to pave asphalt on the temporary CTH PD connection Traffic impacts - 

Work this week (week of 07/02/18): 

 

Project Schedule:

Overall Completion Date: November 1, 2019.

Interim Completion Dates:

June 15, 2018- Wellness Way and Meriter Way. (Local Traffic)

November 15, 2018- CTH M, CTH PD, Mid Town Road. (Switch to Stage 3)

November 15, 2018- Raymond Road, Meriter Way, and Wellness Way. (All work complete.)

 

Please be alert when traveling the CTH M corridor.

 

Contact information -

The project field office is located at:

7395 CTH PD

Verona, WI 53593

Phone: 608-845-3350

Business and property owners can also contact on-site project staff Trenton Diehl at trenton.diehl@strand.com

 

Project Details

The Prairie Hill to Cross Country project extends from Valley View Road to Cross Country Road. The project is scheduled for design from 2011-2016 with construction beginning in fall 2017.  It is anticipated to take two years to complete with an construction end date of fall 2019. The project includes reconstructing CTH M to divided roadway with a median and curb & gutter.

Current proposed plans:

CTH M - Flagstone to Prairie Hill PDF This PDF will open in a new window.

CTH M - Cross Country to Flagstone PDF This PDF will open in a new window.

 

Public Information Meetings - Construction Phase

 

Monthly Project Meeting. WisDOT, City of Madison, City of Verona & Dane County will host monthly project meetings open to the public to get updates on the schedule and ask questions.  This is an opportunity for property owners, residents and businesses to ask questions to the contractor and project staff.  The meetings will be held on the first Thursday of every month during construction at 3:00 pm.  The meetings are located at the Epic Annex located off of Northern Lights Drive in Verona, WI.  Map is attached here PDF 

This PDF will open in a new window.

.

Pre-Construction Public Information Meeting

Integrity Grading and Excavating (Prime Contractor) along with Wisconsin Department of Transportation held a Public Information Meeting regarding the construction of County Highway M in Verona. The meeting took place on Wednesday, September 27 from 5:00 pm until 7:00 pm with a formal presentation at 6:00 pm. The meeting was held at Verona Senior Center, 108 Paoli St, Verona, WI 53593.

 

Proposed night work

Some night work is proposed during this project to minimize inconvenience to Traffic.  Details can be found here:

Night Work Letter PDF 

This PDF will open in a new window.

 

Night Work Map PDF 

This PDF will open in a new window.

 

Public Information Meetings - Design Phase

The City of Madison, City of Verona and Dane County held a Public Information Meeting on this project on December 8, 2011, 6 PM at the Verona Senior Center, 108 Paoli Street, Verona WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions.

December 8, 2011 CTH M Presentation PDF This PDF will open in a new window. CTH M Handout PDF This PDF will open in a new window.

The second Public Information Meeting for this project was held May 24, 2012, 6 PM at the Verona Senior Center, 108 Paoli Street, Verona, WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions. A pdf of the presentation can be found here: May 24, 2012 CTH M Presentation PDF This PDF will open in a new window. A third Public Information Meeting for this project was held on March 12, 2014, 6 P.M. at the Verona Senior Center, 108 Paoli Street, Verona, WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions. March 12, 2014 CTH M Presentation PDF This PDF will open in a new window. An Environmental Assessment has been prepared for this project following the National Environmental Policy Act.  Project Details

Project Type: Road Construction

Location(s): 

County Highway M

Madison, WI. Area: West

Aldermanic District(s): District 1

Impact: Major

Estimated Schedule: 10/02/2017 to 10/31/2019

Project Status: Construction

Project Contact: 

    Chris Petykowski

(608) 267-8678

cpetykowski@cityofmadison.com

 

Midtown Police Station

Update: March 29, 2018

Q1 2018 Project Update: Substantial progress has been made over the past 3 months including: completion of foundation, completion of exterior wall steel, completion of structural steel, completion of floors, near completion of the roof and completion of below grade exterior utilities. Activities currently include finishing the roof, exterior wall sheathing/insulation/air barrier, interior wall framing, and rough in of mechanical/electrical/plumbing. Drywall will start to be installed in late April. No significant cost changes have been encountered to date and the project continues to be on track for the department to move in mid-August 2018.

 

Project Contact: 

 Jim Whitney. 608/266-4563

JWhitney@cityofmadison.com

Jon Evans. 608/243-5893

JEvans@cityofmadison.com

   

Pleasant View 

Project Description

Pleasant View Road will be reconstructed from Mineral Point Road to US 14 as part of a joint project with the City of Middleton. The proposed project will include reconstruction of the existing roadway as an urban arterial with curb and gutter, a raised median, new multi-use path/sidewalk in selected areas, storm sewer, sanitary sewer and water main. Other improvements include new street lighting, pavement marking, signing, and storm water detention ponds. Project Limits

Phase 1 – Greenway Boulevard to US Highway 14

Phase 2 – Old Sauk Road to Greenway Boulevard

Phase 3 – Mineral Point Road to Old Sauk Road

 

Project Schedule

Design: 2017-2020

Construction Phase 1: 2021

Construction Phase 2: 2022

Construction Phase 3: 2023

 

Public Information Meeting

The City of Madison and Middleton held a public involvement meeting on Thursday, June 28, 2018 at the Middleton City Hall, 7426 Hubbard Avenue, Middleton, WI from 6:00 to 8:00 P.M. in the Council Chambers. Meeting topics included the preliminary layout of the road, proposed pedestrian and bike facilities, intersection alternatives (signals vs roundabout) and the project schedule. The presentation and exhibits can be found here:

Presentation PDF 

This PDF will open in a new window.

 

Project Details

Project Type: Bike, Road Construction

Location(s): 

3300 North Pleasant View Road

Madison, WI

Area: West

Aldermanic District(s): District 9

Impact: Major

Project Status: In Design

Project Contact: 

    Andrew Zwieg

608-266-9219

azwieg@cityofmadison.com




Email to a friend Email to a friend

Subscribe to Email List

Subscribe to the Alder McKinney, District 1 email list:


By participating on this list the Wisconsin Public Records Laws may subject your email address to disclosure to third parties. By selecting "Yes" you are requesting that we treat your email address that you have provided to this list as confidential and you are also stating that you would not participate in this service if the City is obligated to release your email address to such third party requesters.


Archive

2019
2018
2017
2016
2015

Labels

Alder Barbara McKinney 1st District Updates
Community-Wide Event
Current City Updates
District 1 Community Up-Dates
Meeting
Poll
Uncategorized

Tags

1000 Friends of Wisconsin  2016 Elver Park Community Day  2017 Westfest  2018 Westfest  2019 Westfest  Addiction  African American  Aging  Alternate Side Parking  Application  Ash tree  Assessment  Auto  Badger Mill Creek  Bench  Black History  Bridge Replacement  BRT  Brush  Brush collection  Brush Pickup  Budget  Burglary  Bus  Bus Rapid Transit  Byrne Criminal Justice Innovaton Grant  Cable  Car  Cardboard  Challenge  Christmas tree  City Clerk's Office - Election Information  City Committee  City Engineer  City Governance  City of Madison Comprehensive Plan  Coding  Cold  Collection Schedule  Common Council  Community Bond  Community Building  Community Events  Conference  Construction  County HWY M  County HWY PD  Dallas  Dedication  Development  Disaster Assistance  Disc golf  District 1 -  Dohm  Downtown  Dream Bus  Drop-off sites  Earth Day  Election  Elver Park  Elver Park Community Recreation Center  Employment  Engineering  Equity  Event  Evergreen  Exact Sciences  Expansion  Fiber  Flooding  Freakfest  Frequent City Contact Information  Gaming  Grants  Hawks Landing  High Point  Historic Preservation  HIV  Hope and A Future  Ice  Imagine Madison  Invasive Elongate Hemlock Scale  Jeffy Trail Expansion  Job fair  Jobs  Judge Doyle Square  Kids  Kwik Trip  Leaf Collection  Leaves  Lewis  Library  License  Listening Session  Lock It or Lose It  Madison Common Council  Madison Community News  Madison Fire Department  Madison Living History Project  Madison Mallards  Madison Metro  Madison Police Department  Make Music Madison  Mayor  Mayor Rhodes-Conway  Mayor Soglin  Mayor's Neighborhood Conference  Meals  Meeting  Midtown Road  MLK  Mobile Resource Trailer  MPD  Mulch  Municipal ID  Natural Lawn  Neighborhood Employment Center  Neighborhood information  Neighborhood Meeting  Olbrich Gardens  Operation Clean Sweep  Opioid  Optic  Park Edge  Parking  Parks  Phairs  Playground  Police  Poll  Poll Workers  Property tax  Public Health Announcemrnts  Public Market  Public Safety  Race  Race 2 Destiny  Raymond Road  Read  Recycling  Repairs  Report  RSVP  Safety  Salt  Sand Bags  Sanitary Sewer  Severe weather  Shredding  ShredFest  Snow  Snow Plow Updates  Spring  Storm Sewer  Stormwater  Street closures  Street sweeping  Streets Division  Streets/Transportation/Roads  Survey  Task Force  Teen employment  Traffic  Training/Employment Opportunities  Transportation  Trash  Tree  Triad  Tutor  Urban League Greater Madison  Valley View Road  Vehicle Registration Fee  Vendor  Verona Road (US 18/151) Project  Volunteer  Water Utility  Watershed  Weather  West Fest  WisDOT  World AIDS Day  Wreath  Yard Waste