Project Summary
This project extends from Valley View Road to 2500′ North of County Trunk Highway PD. This project is scheduled for design from 2011-2015 and construction in 2016. The project includes reconstructing CTH M to divided roadway with a median and curb & gutter. The intersection design of CTH M and Midtown Road includes proposed alternatives with a standard traffic signal and a roundabout.
Current proposed plans can be found here:
Roundabout / Signal Design: CTH M - Flagstone to Prairie Hill
The City of Madison, City of Verona and Dane County held a Public Information Meeting on this project on December 8, 6 PM at the Verona Senior Center, 108 Paoli Street, Verona WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions. A pdf of the presentation can be found here: CTH M PIM PowerPoint
A pdf of the handout provided can be found here: CTH M PIM Handout
The second Public Information Meeting for this project was held May 24th, 6 PM at the Verona Senior Center, 108 Paoli Street, Verona, WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions. A pdf of the presentation can be found here: CTH M PIM 2 Powerpoint
A pdf of the handout provided can be found here: CTH M PIM 2 Handout