City of Madison Logo
Stay Informed   Find us on Facebook   Follow us on Twitter   Receive Email Epdates  

STATUS UPDATE
Work on the project for the week of July 21, 2014:
 

  • Traffic switch for westbound Mineral Point Road is anticipated for Monday or Tuesday. Westbound traffic will be moved to the newly constructed lanes.
  • Work on Mineral Point Road includes electrical work, construction of retaining wall at the Beltline, asphaltic surface, pavement marking
  • Work on South Junction Road includes electrical, topsoil, landscaping, signing, asphalt paving
  • Work on the Jug Handle: work on new pedestrian bridges within the Jug Handle

 
 Traffic Impacts
 

  • Watts Road at South Junction Road will be closed from 10PM Wednesday 7/23 to 6AM Thursday for grading.
  • Watts Road is reduced to one lane in each direction. New traffic pattern for Westbound traffic will begin on Thursday.
  • Eastbound Mineral Point Road is 2-lanes
  • Westbound Mineral Point Road is 2-lanes from the Beltline to the Jug Handle and 1-lane from the Jug Handle to Pleasant View. 
  • After the traffic switch, Westbound Mineral Point Road will be 2-lanes from the Beltline to Pleasant View on the new westbound lanes.
  • South Junction Road is 1-lane in each direction from the Valley View Roundabout to Mineral Point Road and 2-lanes north of Mineral Point Road.
  • Single lane closures are possible between 9:00 AM and 3:00 PM


 

CTH M Corridor Map

The County Highway M corridor is currently under study with the intent to reconstruct the roadway with an urban cross section, including medians, bike lanes and sidewalks. The corridor contains four individual projects.  Please use the links on the right to get information on the individual projects.