N Bassett St - 2019

Last Updated: 12/19/2018


Project Description

The City plans to resurface and replace utilities on a portion of N. Bassett St. in the summer of 2019. A recent history of water main breaks have made this project a priority. This project will also be coordinated with MG&E for the installation of a new conduit duct package.

As part of the project planning, a corridor study will be done on Bassett St. for the portion from W. Dayton St. to W. Wilson St. (to the railroad tracks). Two public involvement meetings will be scheduled for this study, and the dates, times and locations of these meetings are to be determined.

Project Schedule
Construction is anticipated in the summer of 2019

Project Limits
North Bassett Street - W. Dayton St. to W. Washington Ave.

Public Meetings
The Transportation Department is conducting a Bassett Street Corridor Study to help guide the scope of this project.  Details can be found here:
https://www.cityofmadison.com/transportation/studies/bassett-street-corridor-study