Last Updated: 02/01/2021

Solar Electric Installation

Installation of a roughly 30 kW solar photovoltaic system at the Engineering Operations Facility. The system will be roof mounted modules and will produce an estimated 39,000 kWh per year. The systems production will be used to charge Electric Vehicles used by the Engineering Division.


City User Agency: City of Madison Engineering
Planning and Design: January – June 2021
1st Advertisement of Bid: TBD
Bid Due Date: TBD
Construction Start Date: September 2021
Expected Completion Date: December 2021