City Parks Division is reconstructing the basketball court at Reservoir Park in 2019 and 2020. The existing court was in poor condition, contained cracking asphalt, and was showing signs of cracking and deterioration.

The project will consist of the following:

  • Removal of the existing basketball court and standard
  • Installation of a new standard half court basketball area
  • Striping of the new court to half court standards
  • Installation of a new asphalt path spur to serve the court

City Parks construction crews will be removing the existing court and preparing the new site for paving.  Removals will likely take place starting in fall 2019.  Parks has hired a contractor Raymond.P. Cattell Inc to place asphalt pavement once the new site has been prepared. Paving is scheduled to be complete by June 1st, 2020. 

Construction is expected to begin in fall 2019 and be completed by June 1st, 2020. The court will be out of service during this time.

A schematic of the proposed improvements is shown below.

If you have questions or comments please contact Corey Stelljes at (608) 266-6518 or cstelljes@cityofmadison.com.