Sherry (O.B.) Park Playground Replacement - Contract: 2019 Playgrounds - Group 2

Last Updated: 09/20/2019

Sherry (O.B.) Playground - 2018
Sherry (O.B.) Playground - 2018

The playground replacement is underway at OB Sherry Park!

Two public meetings were held to discuss the new play equipment, surfacing and associated improvements.


The first opportunity for input from the neighborhood on the design of the playground was held at:

2019 Playgrounds - Group 2 Workshop
Monday, November 12 at 6:00 PM - Emerson Elementary School Cafeteria (2421 East Johnson Boulevard)

At this session the replacement of the existing equipment, surfacing and benches were discussed during the break-out/table session with Parks staff. Attendees at the session learned that all of the equipment, surfacing, and benches will be replaced with the project. Attendees cast the majority vote for a 5-12 age group play structure and a tied vote for either Playworld Systems or Landscape Structures as the manufacturer to develop two proposals for the follow-up meeting in early 2019. Attendees agreed on wood mulch as the new surfacing material. An accessible path will be added connecting the playground to the existing park sidewalk.


A follow-up meeting to review & vote on the specific equipment & colors for the playground was held:

Sherry (O.B) Park Playground Meeting #2; 6-7:45PM
Thursday, December 20th, 2018
Hawthorn Library 
2707 E Washington Ave
Madison, WI 53704


Attendees cast the majority vote for option 2 from Playworld Systems in the blue and green color scheme.



Please contact Project Manager Sarah Lerner at (608) 261-4281 or slerner@cityofmadison.com if you would like to provide input on the project or have other questions.