Last Updated: 02/09/2018

Project Summary
The proposed project will include removal and replacement of the asphalt pavement and construction of new concrete curb & gutter.  New concrete sidewalk is also proposed on both sides of the street throughout the project limits.  Upgrades to the underground City utilities including the sanitary sewer, water main and storm sewer systems will also be included with the project.  The existing sanitary sewer main will be replaced with a new 8” PVC pipe and the sanitary laterals will be replaced from the new main to the property line for each house.  The storm sewer system will also be upgraded with the project.  New concrete pipe will be installed to provide increased capacity and better storm water drainage for the new streets.  The new storm sewer system will direct a portion of the storm water runoff to the existing pond in Lyckberg Park.

Project Limits
Koster St - Bram St to N Rusk Ave
N Rusk Ave - Koster St to Nygard St

Public Information Meeting
A Public Information Meeting was held on February 8, 2018. A copy of the presentation, handouts, and preliminary plans can be found here:
Presentation
Handout
Preliminary Plans
Preliminary Plans with Aerial Photo