Koster St - N Rusk Ave Reconstruction

Last Updated: 04/24/2018

Project Update:
The Town of Madison approved the portion of the proposed roadway work located in Town of Madison right-of-way on April 17th.   One condition of the Town’s approval was that construction of the project not begin until 2019 to give residents and property owners more time to prepare for the project.  City Engineering will host another Public Information Meeting in June of 2018 to present revised plans that address comments received since the first Public Meeting that was held on Feb 8, 2018.   After holding the second public meeting, City Engineering will finalize plans with an estimated schedule for construction beginning in the spring of 2019.

Project Summary
The proposed project will include removal and replacement of the asphalt pavement and construction of new concrete curb & gutter.  Upgrades to the underground City utilities including the sanitary sewer, water main and storm sewer systems will also be included with the project.  The existing sanitary sewer main will be replaced with a new 8” PVC pipe and the sanitary laterals will be replaced from the new main to the property line for each house.  The storm sewer system will also be upgraded with the project.  New concrete pipe will be installed to provide increased capacity and better storm water drainage for the new streets.  The new storm sewer system will direct a portion of the storm water runoff to the existing pond in Lyckberg Park.

Project Limits
Koster St - Bram St to N Rusk Ave
N Rusk Ave - Koster St to Nygard St

Public Information Meeting
A Public Information Meeting was held on February 8, 2018. A copy of the presentation, handouts, and preliminary plans can be found here:
Presentation
Handout
Preliminary Plans
Preliminary Plans with Aerial Photo