Southwest Commuter Path Signals & Lighting
Project Update
coming soon!
-
Location
1526 Regent Street
Madison, WI 53719
-
Project Type
Construction
-
Status
In design
-
Estimated Schedule
May 22, 2026 (Design) - November 1, 2027 (Construction complete)
-
Impact
Moderate
-
Alder District
Districts 5, 8, and 4
-
Contract Number
9812 (Lighting) and 8842 (Signal)
Project Information
Project Background
City Traffic Engineering plans to install path lighting along the Southwest Commuter path for the section between Monroe Street and N. Shore Drive. The added lighting will improve safety along this approximate 1.3-mile section of the bike path. Currently along this section there are only a few existing lighting fixtures between N Charter Street and N Mills Street and intersection lighting, which will remain.
The project will include approximately 50 new light poles and fixtures. The path lighting will use full cut-off LED fixtures which are Dark Skies compliant which will be mounted on poles that are 20 feet high.
Additionally, City Traffic Engineering plans to install new traffic signals at the intersection of W. Washington Avenue and the Southwest Commuter Path. The traffic signals will improve safety and operation of the shared path crossing and will include pre-emption during train events for the railroad crossing of W. Washington Avenue.
There have been a number of safety incidents and raised concerns about the shared path crossing over the past years. Currently there is a Rectangular Rapid Flashing Beacon (RRFB) which requires cyclists and pedestrians to push a button to activate the beacons when crossing at this intersection. The new traffic signal will continue the use of push buttons for pedestrians and add non-intrusive detection for bicyclists while providing controlled crossings on the path.
The traffic signal project has already conducted a Public Information Meeting and has received Board of Public Works and Common Council approval. It is being combined with the lighting project for contractor rebidding.
Project Limits
-
Lighting
Impacts to the Southwest Commuter path from Monroe Street to N. Shore Drive
-
Traffic Signal
The intersection of the Southwest Commuter path and W. Washington Avenue
Project Schedule
RFP documents can be found on Vendor Net and Demandstar
- Planning and Design: 5/22/26 through 9/8/2026
- Construction and Bid Doc Preparation: September 9, 2026, through October 1, 2026
Bid and Construction:
-
1st Advertisement of Bid for Construction Upcoming
-
Bid Due Date Upcoming
-
Construction Start Date Upcoming
-
Expected Completion Date Upcoming
All information regarding dates/times/locations are informational and should be verified with official bidding documents posted on Bid Express.
There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:
Public Involvement
Public Information Meeting
There will be a public information meeting in the Spring of 2027.
Details coming soon!
Interpretation & Accommodations
If you need an interpreter, translator, materials in alternate formats or other accommodations to access this service, activity or program, please call Jerry Schippa of the Traffic Engineering Division at (608) 267-1969.
Si necesita un intérprete, un traductor, materiales en formatosalternativos u otros arreglospara acceder a este servicio, actividad o programa, comuníquese inmediatamente al número de teléfono que figura a continuación.
Yog tias koj xav tau ib tug neeg txhais lus, ib tug neeg txhais ntawv, cov ntaub ntawv ua lwm yam los sis lwm cov kev pab kom siv tau qhov kev pab, kev ua num los sis kev pab cuam no, thov hu rau tus xov tooj hauv qab no tam sim no.
Previous Public Meetings
Signal recommendations were approved to advertise at the February 11, 2026, Board of Public Works meeting. (Presentation begins at 1:34:40)
City Process Meetings
Presentation at the Board of Public Works - aiming for November 4, 2026
Presentation at the Common Council - aiming for November 24, 2026
Interpretation & Accommodations
Please contact us if you need interpretation, translation, or accommodations.
Por favor comuníquese con nosotros si necesita interpretación, traducción, o adaptaciones.
Thov hu rau peb yog tias koj xav tau kev txhais lus, kev txhais lus, lossis kev pabcuam.
如果您需要口譯、翻譯或便利,請與我們聯繫。