Nautilus Park Playground

Archived Project

This project is complete. This information is available for reference.
If you need an accessible version of this content, please report an accessibility issue.

September 21, 2026 Update

Construction on the nature play area and walking path is now complete!

Outreach for the park/playground design was done in 2023 by Parks staff. Residents had no objections to the chosen design. Prioritization of projects delayed construction till 2026. 

If you have questions, reach out to the project manager: 

Emma Krug

ekrug@cityofmadison.com

View past project updates »

Project Details

Location

321 Nautilus Dr.
Madison, WI 53705

Status

Completed

Estimated Schedule

– Fall 2026

Impact

Minor

Alder District

  • District 19

Project Information

Background

The Parks Division maintains a replacement schedule for all of the city’s playgrounds and the playground at Nautilus Point Park has been identified for replacement in 2023. The typical lifespan of post and platform playground equipment is 20-30 years. With the somewhat recent expansion of stormwater management facilities in Nautilus Point Park, Parks has determined this playground location will not be replaced with typical post and platform playground equipment due to space constraints. Instead, we are proposing to replace it with a small nature play area and walking path, including typical bench seating and “porch swing” type seating.

Project Plan

The existing playground will be removed. A new small nature play area will be installed along with a loop walking path from the Nautilus Dr. sidewalk. Also included will be benches for seating.

Project Updates

September 21, 2026 Update

Construction on the nature play area and walking path is now complete!

Outreach for the park/playground design was done in 2023 by Parks staff. Residents had no objections to the chosen design. Prioritization of projects delayed construction till 2026. 

If you have questions, reach out to the project manager: 

Emma Krug

ekrug@cityofmadison.com

July 6, 2026 Update

Construction for the new playground and walking path is anticipated to begin in July 2026. 

If you have any questions, reach out to the project manager: 

Emma Krug                                                                                           ekrug@cityofmadison.com