Street Repair

The Streets Division is responsible filling potholes and other minor repairs.

Report a Pothole

Streets Division operator filling a pothole with a shovel full of asphalt

An example of typical pothole repair where a shovelful of asphalt is placed into a pothole. 

Other Common Street Repair Concerns

Chip Sealing & Crack Sealing (Engineering Division)

Annual project overseen by the Engineering Division. Check their page for details on this project, including a map on the roads that will be treated.

Road Reconstruction (Engineering Division)

The Engineering Division oversees many projects rebuilding roads each year.  Find the project that is affecting your home on their page. 

Sewer Access Covers / Manhole Covers (Engineering Division)

Report concerns about these in the road via the report-a-problem system. The Engineering Division addresses these issues. 