The main objective of the project is to close a hydraulic (pipeline) gap in Madison’s public water system that exists along Mid Town Road, generally located between Marty Road and South Gammon Road on Madison’s west side.
It has long been Madison Water Utility’s (MWU) intent to close this pipeline gap in order to allow the expansion of its Pressure Zone 9 service area and simultaneously provide redundancy to Pressure Zone 9 with a boundary connection to Pressure Zone 10.
In addition to the overall system resiliency improvements provided, the increased demand from adjacent new development is also a contributing factor in support of this objective.
This construction requires approximately 1450 feet of 12-inch ductile iron water main and fittings, including all associated valves and hydrants.