Well 20 Reservoir Painting Project
Project Details
Project Information
Project Background
Reservoir 20 is a 4.2-million-gallon standpipe, constructed in 1973. The reservoir was last painted in 2000.
Reservoir 20 is nearing the maintenance cycle of every 25-30 years to maintain structural integrity and prevent future degradation. It needs stated upgrades to continue supplying water to the area as reliably as possible.
Reservoir Project Overview
Reservoir 20 will be taken out of service to keep up with standards. This includes draining, completing the required improvements from the DNR, disinfection, and putting the reservoir back into service.
Updates to Reservoir 20 include installation of a failsafe vent, new fall protection equipment, new handrailing system on tank roof. Other work includes cleaning of sediment, miscellaneous repairs, surface preparation, containment shrouding, and application of paints and coatings.