Up-Flo Filter Typical Maintenance Requirements
Reporting Requirements
An initial installation certification (as-built) stamped by a Professional Engineer (P.E.) registered in the state of Wisconsin shall be submitted to the City Engineer upon completion of construction. The as-built shall be of sufficient detail to show the system was properly constructed and is functioning as designed. It shall include a statement by the certifying P.E. and photograph(s).
An annual report shall be submitted via email to City Stormwater Management staff. The report shall include records of all inspections and maintenance performed for the year. Inspections shall be done every calendar year, with reports being submitted by June 1 of the following year.
Maintenance Provisions
Owner shall install and maintain filter in accordance with plans approved by City Engineer and in accordance with WDNR Conservation Practice Standard #1010 Proprietary Stormwater Filtration Devices. Any alterations to approved system shall be approved by the City Engineer.
- An [Up-Flo Filter manufactured by Hydro International of Portland, ME containing _____ filter modules] with CPZ media mix shall be installed in the storm catch basin [location], in accordance with plans approved by the City Engineer. Any alterations to the approved Up-Flo Filter system shall be approved by the City Engineer.
- Owner shall maintain records of installation, inspections, cleaning, filter media replacement, and any other maintenance in accordance with Chapter 37 of the Madison General Ordinances.
- Owner shall inspect and maintain unit in accordance with manufacturer's instructions and according to the following chart.
| Activity | Frequency |
|---|---|
| Inspection |
|
| Floatables/Oils Removal |
|
| Sediment Removal |
|
| Media Pack Replacement |
|
| Drain Down Filter Replacement |
|