The following inspections are required, remember not to cover permitted work before it is inspected:

Building Inspections

New Building or Addition

  1. Footing
  2. Framing (after plumbing, heating, and electric runs are made but before anything is covered up)
  3. Insulation (includes installed vapor retarder)
  4. Final

Alterations

  1. Framing
  2. Final

Mechanical Inspections

  1. Trench depth (for exterior trenches)
  2. Rough (electrical, plumbing, and/or heating runs made without fixtures or devices connected)
  3. Final (with devices connected)