City of
Madison

District 1

Alder Barbara Harrington-McKinney

Alder Barbara Harrington-McKinney

Alder Barbara Harrington-McKinney,
Council Vice President

Contact Information

Home Address:

1209 Dayflower Drive
Madison , WI 53719

Council Office

Common Council Office:
210 Martin Luther King, Jr. Blvd
Room 417
Madison, WI 53703
Phone: (608) 266-4071
Fax: (608) 267-8669
WI Relay Service

Alder Harrington-McKinney’s Updates

Common Council Agenda

June 18, 2019 12:18 PM

Tonight's Common Council Meeting - 6:30 pm 210 MLK, Room 201, City County Building

Public Hearing - Speaking Limits

5 minutes, Information Hearing, 5 minutes, other items 3 minutes. You must register before your item is considered by the Council.

Report of the Planning Commission 

55535

Creating Section 28.022–00374 of the Madison General Ordiance to change the zoning of property located at 2801 Hickory Ridge Road, 7th Aldermanic District from SR-V2 (Suburban Residental - Varied 2) District to TR-C1 (Traditional Residential-Consistent 1)District.  The items are before Council tonight, after public testimony and an opportunity to ask questions of staff, the council will deliberate and make a decision on whether to approve or refer this item.

While this proposed new development is not in District 1, I will stay in close contact with Alder Moorland, District 7, on the status of this proposed new development in her district. Important to closely track the re-zoning of 2801 Hickory Ridge Rd. as it boarders on the projected Raymond Road construction.  

56301

Authorizing the Mayor, Chief Police and the City Clerk to sign a contract with the Madison Metropolitan School District (MMSD) to provide School Resource Officers for the four MMSD high schools for a three year term, beginning August 1, 2019 through June 15, 2022. 

Construction update on the Raymond Road Project.

The City provides monthly updates on this project. I would encourage you to also continue regularly review these updates.

Construction Update

Anticipated Upcoming Roadway Closures:

No anticipated upcoming roadway closures at this time.
Stage: Stage 3- work consists of roadway and structure construction on Raymond Road, CTH M, CTH PD, Mid Town Road, and additional side roads throughout the project limits. Multiple work operations will be taking place on both sides of CTH M, CTH PD, and Mid Town Road. 

Work this week (week of 6/17/19):

Crews will continue survey and layout operations.
Crews continue removing structure B-13-845 falsework. 
Crews anticipate staining retaining wall structures, bridge structures, and culvert structures throughout the project. 
Crews will continue Stage 3 grading and aggregate placement operations throughout the project. 
Crew will place concrete curb and gutter on the east leg of CTH PD.
Crews will continue storm sewer installation between Flagstone Drive and Mid Town Road. 
Crews will begin setting precast culvert sections north of Mid Town Road.
Crews will continue watermain and sanitary sewer installations south of CTH PD.
Crews will continue conduit installations, and lighting / traffic signal base placement.
Crews will continue erosion control and restoration items as necessary.
Crews will not be performing any work or hauling on the project during the period of Friday (6/21) through Sunday (6/23), due to the American Family PGA Golf Tournament.

Work scheduled for the next week (week of 6/24/19):
Crews will continue survey and layout operations. 
Crews will continue grading and aggregate placement operations throughout the project.
Crews will continue storm sewer installation throughout the project.
Crews will continue setting precast culvert sections north of Mid Town Road.
Crews will continue watermain and sanitary sewer installations throughout the project.
Crews will continue staining retaining wall structures and culvert structures.
Crews will continue conduit installations, and lighting / traffic signal base placement.

Traffic Impacts - 

One lane of traffic in each direction will be maintained on CTH M, CTH PD, and Mid Town Road on the existing travel lanes during peak travel times.
Single lane roadway flagging operations will be taking place periodically throughout Stage 3 between the hours of 9am and 3pm and overnight between 7pm and 6am.
Please be alert when traveling the CTH M corridor.

General Project Information

The reconstruction of CTH M includes earthwork, storm sewer, sanitary sewer, water main, base aggregate, concrete curb and gutter, concrete sidewalk, HMA pavement, Structures B-13-845, retaining walls, street lighting, traffic signals. The overall work is scheduled for completion on November 1, 2019 with several interim completion dates.

Project Schedule

Overall Completion Date: November 1, 2019.
Interim Completion Dates:

November 15, 2018- CTH M, CTH PD, Mid Town Road. (Switch to Stage 3)
November 15, 2018- Raymond Road, Meriter Way, and Wellness Way. (All work complete.)

Contact Information

The project field office is located at:
7395 CTH PD
Verona, WI 53593
Phone: 608-845-3350

Business and property owners can also contact on-site project staff Trenton Diehl at trenton.diehl@strand.com

Project Details

The Prairie Hill to Cross Country project extends from Valley View Road to Cross Country Road. The project is scheduled for design from 2011-2016 with construction beginning in fall 2017.  It is anticipated to take two years to complete with an construction end date of fall 2019. The project includes reconstructing CTH M to divided roadway with a median and curb & gutter.

Current proposed plans:

CTH M - Flagstone to Prairie Hill PDF 
CTH M - Cross Country to Flagstone PDF 

Public Information Meetings - Construction Phase

Monthly Project Meeting

WisDOT, City of Madison, City of Verona & Dane County will host monthly project meetings open to the public to get updates on the schedule and ask questions. This is an opportunity for property owners, residents and businesses to ask questions to the contractor and project staff. The meetings will be held on the first Thursday of every month during construction at 2:30 pm.  The meetings are located at the Epic Annex located off of Northern Lights Drive in Verona, WI. Map is attached here PDF .

Pre-Construction Public Information Meeting

Integrity Grading and Excavating (Prime Contractor) along with Wisconsin Department of Transportation held a Public Information Meeting regarding the construction of County Highway M in Verona. The meeting took place on Wednesday, September 27 from 5:00 pm until 7:00 pm with a formal presentation at 6:00 pm. The meeting was held at Verona Senior Center, 108 Paoli St, Verona, WI 53593.

Proposed Night Work

Some night work is proposed during this project to minimize inconvenience to Traffic.  Details can be found here:

Night Work Letter PDF 

Night Work Map PDF 

Public Information Meetings - Design Phase

The City of Madison, City of Verona and Dane County held a Public Information Meeting on this project on December 8, 2011, 6 PM at the Verona Senior Center, 108 Paoli Street, Verona WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions.

December 8, 2011 CTH M Presentation PDF 
CTH M Handout PDF 

The second Public Information Meeting for this project was held May 24, 2012, 6 PM at the Verona Senior Center, 108 Paoli Street, Verona, WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions. A pdf of the presentation can be found here:

May 24, 2012 CTH M Presentation PDF 
CTH M Handout PDF 

A third Public Information Meeting for this project was held on March 12, 2014, 6 P.M. at the Verona Senior Center, 108 Paoli Street, Verona, WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions.

March 12, 2014 CTH M Presentation PDF 

Environmental Assessment

An Environmental Assessment has been prepared for this project following the National Environmental Policy Act.  This document may be viewed here: 

Table of Contents PDF 
Basic Sheets PDF 
Factor Sheets PDF 
Exhibits PDF 
Attachments PDF 

Project Details

Project Type: Road Construction

Location(s): 

County Highway M
Madison, WI

Area: West

Aldermanic District(s): District 1

Impact: Major

Estimated Schedule: 10/02/2017 to 10/31/2019

Project Status: Construction

Project Contact: 

    Chris Petykowski
(608) 267-8678
cpetykowski@cityofmadison.com

 

Construction Update

Project Schedule:

Overall Completion Date: November 1, 2019.

 

Anticipated Upcoming Roadway Closures:

No anticipated upcoming roadway closures at this time.


Stage: Stage 3- work consists of roadway and structure construction on Raymond Road, CTH M, CTH PD, Mid Town Road, and additional side roads throughout the project limits. Multiple work operations will be taking place on both sides of CTH M, CTH PD, and Mid Town Road. 

 

Work this week (week of 6/17/19):

Crews will continue survey and layout operations.
Crews continue removing structure B-13-845 falsework. 
Crews anticipate staining retaining wall structures, bridge structures, and culvert structures throughout the project. 
Crews will continue Stage 3 grading and aggregate placement operations throughout the project. 
Crew will place concrete curb and gutter on the east leg of CTH PD.
Crews will continue storm sewer installation between Flagstone Drive and Mid Town Road. 
Crews will begin setting precast culvert sections north of Mid Town Road.
Crews will continue watermain and sanitary sewer installations south of CTH PD.
Crews will continue conduit installations, and lighting / traffic signal base placement.
Crews will continue erosion control and restoration items as necessary.
Crews will not be performing any work or hauling on the project during the period of Friday (6/21) through Sunday (6/23), due to the American Family PGA Golf Tournament.

Work scheduled for the next week (week of 6/24/19):
Crews will continue survey and layout operations. 
Crews will continue grading and aggregate placement operations throughout the project.
Crews will continue storm sewer installation throughout the project.
Crews will continue setting precast culvert sections north of Mid Town Road.
Crews will continue watermain and sanitary sewer installations throughout the project.
Crews will continue staining retaining wall structures and culvert structures.
Crews will continue conduit installations, and lighting / traffic signal base placement.




Traffic Impacts - 

One lane of traffic in each direction will be maintained on CTH M, CTH PD, and Mid Town Road on the existing travel lanes during peak travel times.
Single lane roadway flagging operations will be taking place periodically throughout Stage 3 between the hours of 9am and 3pm and overnight between 7pm and 6am.
Please be alert when traveling the CTH M corridor.

General Project Information

The reconstruction of CTH M includes earthwork, storm sewer, sanitary sewer, water main, base aggregate, concrete curb and gutter, concrete sidewalk, HMA pavement, Structures B-13-845, retaining walls, street lighting, traffic signals. The overall work is scheduled for completion on November 1, 2019 with several interim completion dates.

Project Schedule

Overall Completion Date: November 1, 2019.
Interim Completion Dates:

November 15, 2018- CTH M, CTH PD, Mid Town Road. (Switch to Stage 3)
November 15, 2018- Raymond Road, Meriter Way, and Wellness Way. (All work complete.)

Contact Information

The project field office is located at:
7395 CTH PD
Verona, WI 53593
Phone: 608-845-3350

Business and property owners can also contact on-site project staff Trenton Diehl at trenton.diehl@strand.com

Project Details

The Prairie Hill to Cross Country project extends from Valley View Road to Cross Country Road. The project is scheduled for design from 2011-2016 with construction beginning in fall 2017.  It is anticipated to take two years to complete with an construction end date of fall 2019. The project includes reconstructing CTH M to divided roadway with a median and curb & gutter.

Current proposed plans:

CTH M - Flagstone to Prairie Hill PDF 
CTH M - Cross Country to Flagstone PDF 

Public Information Meetings - Construction Phase

Monthly Project Meeting

WisDOT, City of Madison, City of Verona & Dane County will host monthly project meetings open to the public to get updates on the schedule and ask questions. This is an opportunity for property owners, residents and businesses to ask questions to the contractor and project staff. The meetings will be held on the first Thursday of every month during construction at 2:30 pm.  The meetings are located at the Epic Annex located off of Northern Lights Drive in Verona, WI. Map is attached here PDF .

Pre-Construction Public Information Meeting

Integrity Grading and Excavating (Prime Contractor) along with Wisconsin Department of Transportation held a Public Information Meeting regarding the construction of County Highway M in Verona. The meeting took place on Wednesday, September 27 from 5:00 pm until 7:00 pm with a formal presentation at 6:00 pm. The meeting was held at Verona Senior Center, 108 Paoli St, Verona, WI 53593.

Proposed Night Work

Some night work is proposed during this project to minimize inconvenience to Traffic.  Details can be found here:

Night Work Letter PDF 

Night Work Map PDF 

Public Information Meetings - Design Phase

The City of Madison, City of Verona and Dane County held a Public Information Meeting on this project on December 8, 2011, 6 PM at the Verona Senior Center, 108 Paoli Street, Verona WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions.

December 8, 2011 CTH M Presentation PDF 
CTH M Handout PDF 

The second Public Information Meeting for this project was held May 24, 2012, 6 PM at the Verona Senior Center, 108 Paoli Street, Verona, WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions. A pdf of the presentation can be found here:

May 24, 2012 CTH M Presentation PDF 
CTH M Handout PDF 

A third Public Information Meeting for this project was held on March 12, 2014, 6 P.M. at the Verona Senior Center, 108 Paoli Street, Verona, WI. Representatives from the City of Madison, City of Verona and Dane County discussed the proposed project and answered questions.

March 12, 2014 CTH M Presentation PDF 

Environmental Assessment

An Environmental Assessment has been prepared for this project following the National Environmental Policy Act.  This document may be viewed here: 

Table of Contents PDF 
Basic Sheets PDF 
Factor Sheets PDF 
Exhibits PDF 
Attachments PDF 

Project Details

Project Type: Road Construction

Location(s): 

County Highway M
Madison, WI

Area: West

Aldermanic District(s): District 1

Impact: Major

Estimated Schedule: 10/02/2017 to 10/31/2019

Project Status: Construction

Project Contact: 

    Chris Petykowski
(608) 267-8678
cpetykowski@cityofmadison.com




Email to a friend Email to a friend

Subscribe to Email List

Subscribe to the Alder McKinney, District 1 email list:


By participating on this list the Wisconsin Public Records Laws may subject your email address to disclosure to third parties. By selecting "Yes" you are requesting that we treat your email address that you have provided to this list as confidential and you are also stating that you would not participate in this service if the City is obligated to release your email address to such third party requesters.


Archive

2019
2018
2017
2016
2015

Labels

Alder Barbara McKinney 1st District Updates
Community-Wide Event
Current City Updates
District 1 Community Up-Dates
Meeting
Poll
Uncategorized

Tags

1000 Friends of Wisconsin  2016 Elver Park Community Day  2017 Westfest  2018 Westfest  2019 Westfest  Addiction  African American  Aging  Alternate Side Parking  Application  Art  Ash tree  Assessment  Auto  Badger Mill Creek  Bench  Black History  Bridge Replacement  BRT  Brush  Brush collection  Brush Pickup  Budget  Burglary  Bus  Bus Rapid Transit  Byrne Criminal Justice Innovaton Grant  Cable  Car  Cardboard  Career fair  Challenge  Chickens  Christmas tree  City Clerk's Office - Election Information  City Committee  City Engineer  City Governance  City of Madison Comprehensive Plan  Coding  Cold  Collection Schedule  Common Council  Community Bond  Community Building  Community Events  Conference  Construction  County HWY M  County HWY PD  Dallas  Dedication  Development  Disaster Assistance  Disc golf  District 1 -  Dohm  Downtown  Dream Bus  Drop-off sites  Earth Day  Election  Elver Park  Elver Park Community Recreation Center  Employment  Employment center  Engineering  Equity  Event  Evergreen  Exact Sciences  Expansion  Fiber  Flooding  Freakfest  Frequent City Contact Information  Gaming  Grants  Hawks Landing  High Point  Historic Preservation  HIV  Hope and A Future  Ice  Imagine Madison  Invasive Elongate Hemlock Scale  Jeffy Trail Expansion  Job fair  Jobs  Judge Doyle Square  Kids  Kwik Trip  Leaf Collection  Leaves  Lewis  Library  License  Listening Session  Lock It or Lose It  Madison Common Council  Madison Community News  Madison Fire Department  Madison Living History Project  Madison Mallards  Madison Metro  Madison Police Department  Make Music Madison  Mayor  Mayor Rhodes-Conway  Mayor Soglin  Mayor's Neighborhood Conference  Meals  Meeting  Mentor  Midtown Road  MLK  Mobile Resource Trailer  MPD  Mulch  Municipal ID  Natural Lawn  Neighborhood Employment Center  Neighborhood information  Neighborhood Meeting  Olbrich Gardens  Operation Clean Sweep  Opioid  Optic  Park Edge  Park Ridge  Parking  Parks  Phairs  Playground  Police  Poll  Poll Workers  Property tax  Public Health Announcemrnts  Public Market  Public Safety  Race  Race 2 Destiny  Raymond Road  Read  Recycling  Repairs  Report  Roosters  RSVP  Safety  Salt  Sand Bags  Sanitary Sewer  Severe weather  Shredding  ShredFest  Snow  Snow Plow Updates  Spring  Storm Sewer  Stormwater  Street closures  Street sweeping  Streets Division  Streets/Transportation/Roads  Survey  Task Force  Teen employment  Traffic  Training  Training center  Training/Employment Opportunities  Transportation  Trash  Tree  Triad  Tutor  Urban League Greater Madison  Valley View Road  Vehicle Registration Fee  Vendor  Verona Road (US 18/151) Project  Volunteer  Water Utility  Watershed  Weather  West Fest  West Police District  Westfest  WisDOT  World AIDS Day  Wreath  Yard Waste  Zoning