Evergreen, Ohio, Center, Willard Avenues Reconstruction
May 1, 2026 Update
The City will begin with the public engagement and preliminary design in the fall of 2026.
View past project updates »Project Details
Project Information
Project Overview
The City is planning to reconstruct Evergreen Ave (Oakridge Ave to Center Ave), Ohio Ave (Willard Ave to Center Ave), Center Ave (Dunning St to Hudson Ave), and Willard Ave (Evergreen Ave to Ohio Ave).
The project includes the replacement of sanitary sewer and laterals, water main, storm sewer main and laterals, curb and gutter, gravel base, asphalt pavement, pavement marking, and signs. The sidewalk will be spot replaced as needed. The curb ramps will be replaced at the intersections to provide better access to pedestrians crossing the streets.
The project will also include connecting new sanitary sewer to existing facilities along Oakridge Ave at Evergreen Ave and Ohio Ave. Lane and parking reductions are anticipating during construction on Oakridge Ave at those intersections.
Project Limits
- Evergreen Ave – Oakridge Ave to Center Ave
- Ohio Ave – Willard Ave to Center
- Center Ave – Dunning St to Hudson Ave
- Willard Ave – Evergreen Ave to Ohio Ave
- Elmside Blvd – Lakeland Ave to Oakridge Ave
Project Schedule
- Design: Fall/Winter 2025/2026
- Bids Advertised: Spring 2026
- Construction: Summer – Fall 2027
Public Involvement
There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:
Public Information Meetings
- The City will begin with the public engagement and preliminary design in the fall of 2026.
- More information will be posted when available.
City Process, Meetings
- Transportation Commission: Information will be posted when available.
- Board of Public Works Information will be posted when available.
- Common Council Information will be posted when available.
Project Updates
May 1, 2026 Update
The City will begin with the public engagement and preliminary design in the fall of 2026.