Archived Projects
These projects are complete. This information is available for reference.
- 3400 Block East Washington Ave Sewer Replacement
- 5630 Schroeder Rd
- Adams St-Jefferson St 1900 Block Alley Reconstruction
- Alicia Ashman Library
- American Parkway Sidewalk
- Anderson Street
- Atticus Way
- Atwood Avenue
- Autumn Ridge Path
- Bassett St, N. - 2019
- Bassett Street
- Beltline / Verona Road
- Bikeways 2022: Path Resurfacings & Bay Creek Bike Improvements
- Bikeways 2023
- Blackhawk Ave, N.-Bruce Ct-Heather Crest Resurfacing
- Blackhawk Tower Radio Equipment Shelter
- Blair Street South
- Blair Street, N Reconstruction
- Blair Street/John Nolen Drive Corridor Study
- Bridge Repairs 2020
- Brittingham Boathouse Exterior Painting
- Brittingham Park
- Broom St (W. Washington - Dayton)
- Bryan St, Daley Dr, James St, Thorp St Reconstruction
- Buckeye Rd
- Burr Jones Shoreline Steel Seawall Removal
- Calypso Rd and Fremont Ave Resurfacing with Utilities
- Campbell Street - Vilas Avenue
- Campus Drive - Bridge Repairs 2017
- Capital City Path Segment 1 (Buckeye Rd to Dondee Road)
- Capital City Trail Epoxy Coating
- Capitol East District Parking Structure
- CCB Floors 1, 4 & 5 Office Remodels
- Cedar St., South St., High St., W Wingra Dr.
- Cedar Street, Beld Street Reconstruction, Cedar Street Phase 2 Construction
- Central Library
- Commercial Avenue Sanitary Sewer Reconstruction
- Cottage Grove Road (I39 to Sprecher Rd)
- Country Grove Park Shelter
- County Highway M & S
- County Highway M - Prairie Hill to Cross Country
- County Highway PD
- Cub Foods Demolition
- Dairy Drive
- Darbo Drive to Webb Avenue Connection
- Darwin Road
- Davidson St, Drexel Ave, Lake Edge Blvd.
- Davies Street and Dempsey Road Reconstruction
- Dayton Street, West
- Dean Ave., East and Allis Ave.
- Dearholt Road Resurfacing (Milward Drive to Odana Road)
- Demetral Park Path: Phase 2
- Doncaster Beverly Danbury Reconstruction
- Door Creek Park Shelter
- Dunning Street, Jackson Street, Lafollette Avenue Reconstruction
- E Wilson Street and E Doty Street Reconstruction
- East Badger Mill Creek Watershed Study
- East Dayton Street Resurfacing
- East District Police
- East Towne Detention Basin Improvements
- East Washington Bridge Repairs
- Elizabeth Street - N Ingersoll Street
- Emerson St, Lowell St Reconstruction
- Engineering Operations Facility - Canopy Replacement/Expansion
- Evergreen, Ohio, Sommers Reconstruction
- Fairchild Building Study
- Far West Public Works Facility
- Felland Road and Tranquility Trail Roundabout
- Felland Road Reconstruction
- Fire Station 1/Fire Administration
- Fire Station 10 Lighting Retrofit
- Fire Station 10 Restrooms Remodel
- Fire Station 10 Retaining Wall
- Fire Station 10 Roof Replacement
- Fire Station 14
- Fire Station 14 Training Site Phase 1
- Fire Station 14 Training Tower
- Fire Station 2 Lighting Retrofit
- Fire Station 3
- Fire Station 4
- Fire Station 4 Lighting Retrofit
- Fire Station 5 HVAC Upgrade & Kitchen Remodel
- Fire Station 5 Wall Removal & Improvements
- Fire Station 9
- Fire Station 9 Kitchen and Lighting Improvements
- Forest Hill Mausoleum
- Forster Drive Resurfacing w/Utilities Replacement
- Frey St and Sawyer Ter
- Gammon Road and Watts Road Intersection
- Gammon Road, S. and West Towne Path
- Garver Office/Olbrich Cottage Masonry Repointing
- Garver Path
- Gates of Heaven - Floor Replacement
- Gates of Heaven - Roof Replacement
- Gates of Heaven Masonry Restoration
- Giddings Park Shoreline Riprap Repair
- Gilman St., Pinckney St., Butler St.
- Gilson St Reconstruction
- Glenview Dr, Joylynne Dr, Woodlawn Dr
- Goodman Library Lighting Upgrade