Phase 3 (Olin to Beltline)
Phase Three of the project includes the segment of John Nolen Dr from the Beltline Hwy to E Olin Ave, and the segment of E Olin Ave from John Nolen Dr to Wingra Creek. This project has been selected for funding and is expected to be constructed in 2029.
Phase Three (John Nolen Dr: Beltline Hwy to E Olin Ave; E Olin Ave: John Nolen Dr to Wingra Creek) will include the following improvements:
- Full pavement and curb & gutter replacement
- Lane width and cross-section changes to urbanize the roadway and provide traffic calming
- Reconstruction of storm sewer, including large catch basins for sediment/pollutant collection
- Improved traffic signals and street lighting
- Intersection improvements to enhance bike-pedestrian safety and accessibility
- Evaluate enhanced bike-pedestrian connectivity, including the potential for new path connections