This project is currently under design development.
View past project updates »Project Details
Project Information
Project Overview
This project will remove this existing ~ 2' of deposition along the entire length of the channel south of the bike path underpass and north of Interlaken Pass. This will restore the channel to the original design grades.
This project will also replace existing broken plastic pipes from the adjacent raingarden to the greenway and replace these with fire-retardant concrete pipes and apron endwalls – allowing staff to maintain this area with prescribed burns.
This project will also install a 6'x6' catch basin upstream to collect sediment prior to entering the greenway to reduce future deposition within the channel. This material is burying the existing storm outlets, contributing to street flooding and reducing the flood capacity of this channel. Additionally, accumulation is also impacting the rate at which the water drains from the adjacent bike path, these improvements should help improve these issues.
Project Limits
Interlaken Pass north to bike path overpass.
Project Schedule
Construction anticipated for summer 2026.
Public Involvement
There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:
Public Information Meetings
More information will be posted when available.
City Process, Meetings
Common Council More information will be posted when available.
Board of Public Works More information will be posted when available.
Project Updates
April 6, 2026 Update
This project is currently under design development.