American Parkway Sidewalk

Archived Project

This project is complete. This information is available for reference.

Project Details

Location

  • 5921 American Parkway
    Madison, WI 53718

Project Type

Status

Completed

Estimated Schedule

Alder District

  • District 17

Project Information

Project Details
This project will install new sidewalk where there is currently a gap in existing pedestrian facilities on the east side of American Parkway. Storm sewer will also be adjusted and installed as part of the project in order to maintain drainage patterns along the road ditch. An overview of the proposed installation can be found here: Plan Overview

Project Limits
Sidewalk will be installed in front of 5917, 5929, and 6001 American Parkway.

 