Completed Projects
- 5630 Schroeder Rd
- Adams St-Jefferson St 1900 Block Alley Reconstruction
- Alicia Ashman Library
- American Parkway Sidewalk
- Anderson Street
- Bassett St, N. - 2019
- Bassett Street
- Beltline / Verona Road
- Blackhawk Ave, N.-Bruce Ct-Heather Crest Resurfacing
- Blackhawk Tower Radio Equipment Shelter
- Blair Street South
- Blair Street, N Reconstruction
- Blair Street/John Nolen Drive Corridor Study
- Bridge Repairs 2020
- Brittingham Park
- Broom St (W. Washington - Dayton)
- Bryan St, Daley Dr, James St, Thorp St Reconstruction
- Buckeye Rd
- Calypso Rd and Fremont Ave Resurfacing with Utilities
- Campbell Street - Vilas Avenue
- Campus Drive - Bridge Repairs 2017
- Capital City Path Segment 1 (Buckeye Rd to Dondee Road)
- Capital City Trail Epoxy Coating
- Capitol East District Parking Structure
- Cedar St., South St., High St., W Wingra Dr.
- Cedar Street, Beld Street Reconstruction, Cedar Street Phase 2 Construction
- Central Library
- Cottage Grove Road (I39 to Sprecher Rd)
- County Highway M - Prairie Hill to Cross Country
- County Highway M & S
- County Highway PD
- Cub Foods Demolition
- Dairy Drive
- Darbo Drive to Webb Avenue Connection
- Darwin Road
- Davidson St, Drexel Ave, Lake Edge Blvd.
- Dayton Street, West
- Dean Ave., East and Allis Ave.
- Dearholt Road Resurfacing (Milward Drive to Odana Road)
- Demetral Park Path: Phase 2
- Dunning Street, Jackson Street, Lafollette Avenue Reconstruction
- East Badger Mill Creek Watershed Study
- East Dayton Street Resurfacing
- East District Police
- East Washington Bridge Repairs
- Elizabeth Street - N Ingersoll Street
- Emerson St, Lowell St Reconstruction
- Engineering Operations Facility - Canopy Replacement/Expansion
- Fairchild Building Study
- Far West Public Works Facility
- Felland Road and Tranquility Trail Roundabout
- Felland Road Reconstruction
- Fire Station 1/Fire Administration
- Fire Station 10 Restrooms Remodel
- Fire Station 10 Retaining Wall
- Fire Station 10 Roof Replacement
- Fire Station 14
- Fire Station 14 Training Tower
- Fire Station 3
- Fire Station 4
- Fire Station 5 HVAC Upgrade & Kitchen Remodel
- Fire Station 5 Wall Removal & Improvements
- Fire Station 9
- Fire Station 9 Kitchen and Lighting Improvements
- Forest Hill Mausoleum
- Forster Drive Resurfacing w/Utilities Replacement
- Frey St and Sawyer Ter
- Gammon Road, S. and West Towne Path
- Garver Path
- Gates of Heaven - Floor Replacement
- Gates of Heaven - Roof Replacement
- Gates of Heaven Masonry Restoration
- Gilman St., Pinckney St., Butler St.
- Gilson St Reconstruction
- Glenview Dr, Joylynne Dr, Woodlawn Dr
- Goodman Park Building D
- Gorham St. Sanitary Sewer Replacement
- Gorham Street Resurfacing
- Gorham Street, E.
- Government East Ramp Demolition
- Greentree/McKenna Watershed Study
- Gregory St, Cross St, Copeland St, and Western Ave Reconstruction
- Groveland Terrace
- Hancock Street, N.
- Hawks Landing Flood Mitigation
- Haywood Drive
- Helena Street, Jenifer Street, Russell Street Reconstruction
- High Point Road Bridge Replacement
- Hillcrest Drive Resurfacing with Utilities
- Hooker Ave., Sheridan Dr., Steensland Dr. Resurfacing w/Utilities
- Ice Age Junction Path
- Ice Age Junction Path / Pheasant Branch Greenway
- Ice Age Junction Path, Raymond Rd to Flagstone Dr
- JOHN NOLEN DRIVE
- Johnson St, East
- Johnson St, W.
- Judge Doyle Garage
- Judge Doyle Podium
- Julia Street Resurfacing
- Koster St - N Rusk Ave Reconstruction