Archived Projects
These projects are complete. This information is available for reference. If you need an accessible version of this content, please report an accessibility issue.
- 811 Old Timber Pass Stormwater Pond & Greenway
- 9401 Watts Road Stormwater Pond & Greenway
- Adams St-Jefferson St 1900 Block Alley Reconstruction
- Atticus Way
- Atwood Avenue
- Autumn Ridge Path
- Badger Rusk Shared-Use Path
- Bartillon Shelter
- Blair Street South
- Broom St (W. Washington - Dayton)
- Buffalo Trail, Barron Court, Green Lake Pass
- Burr Jones Shoreline Steel Seawall Removal
- CCB Floors 1, 4 & 5 Office Remodels
- CCB Remodel - DCR 104 & 108A
- Central Isthmus Watershed Study
- Cherokee No. 2 Lift Station Emergency Generator
- City Engineering Stormwater Utility Vegetation Management Plan
- Commercial Avenue Sanitary Sewer Reconstruction
- Country Grove Park Shelter
- Dairy Dr Campground Demolition and Site Restoration
- Davies Street and Dempsey Road Reconstruction
- Dearholt Road Resurfacing (Milward Drive to Odana Road)
- Doncaster Beverly Danbury Reconstruction
- Door Creek Park Shelter
- E Wilson Street and E Doty Street Reconstruction
- East Badger Mill Creek Watershed Study
- East Isthmus and Yahara River Watershed Study
- East Streets Maintenance Facility Fire Sprinkler Replacement
- East Towne Detention Basin Improvements
- Engineering Operations Facility Locker Room Renovation
- Evergreen, Ohio, Sommers Reconstruction
- Felland Road Reconstruction
- Fire Station 10 Restrooms Remodel
- Fire Station 14
- Fire Station 14 Training Site Phase 1
- Fire Station 8 Lighting Retrofit
- Fordem Avenue Sanitary Sewer Replacement
- Gates of Heaven Masonry Restoration
- Greentree/McKenna Watershed Study
- Hammersley Road Resurfacing
- Hawks Landing Flood Mitigation
- Hawthorne Court Road Reconstruction
- Hoover Boathouse Door, Window and Siding Replacement and Alternate #1: Exterior Painting
- Hudson, Miller, Willard, Center, Sommers Reconstruction
- John Nolen Drive Watershed Study
- Lake Mendota Drive
- Lake Street Sanitary Sewer Replacement
- Library Services and Support Facility Exterior Envelope
- Lower Badger Mill Creek Ecological Restoration
- Lower Badger Mill Creek Pond
- Lower Badger Mill Creek Watershed Study
- Madison Municipal Building
- Madison Pheasant Branch Watershed Study
- Madison Public Market
- McKenna Blvd. Flood Mitigation Project
- Melvin Court and Ridgeway Avenue Resurfacing with Utilities
- Mendota-Grassman Greenway Flood Mitigation and Restoration Design
- Meyer Avenue Reconstruction
- Nakoma Road Sidewalk 2025
- Nakoosa Trail Fleet/Fire/Radio Shop Facility
- Near West Watershed Study
- North Franklin Avenue and Stevens Street Resurfacing
- North Lake Street Boat Ramp
- Olbrich Gardens Expansion - Project 1
- Olbrich Gardens Royal Thai Pavilion Roof Replacement
- Olin Waste Transfer Drop-off Site
- Park Edge Drive Flood Mitigation
- Pinney Neighborhood Library
- Pleasant View Road
- Prairie Hills Pond Dredging
- Regent Street Culvert Replacement at Kenosha Drive
- Rennebohm Park Shelter Restroom Renovation
- Robin Greenway and Orchard Drive Culvert
- Rutledge Street Reconstruction
- Shawnee Pass
- Solar PV - CDA Truax Apartments
- Solar PV - Fire Station 09
- Solar PV - Police East District
- Solar PV – Water Utility Olin Ave
- Solar PV – Water Utility Paterson Vehicle Storage
- South Charter Street Alley
- South Madison Demolitions & Site Restorations
- South Paterson Street Sanitary Sewer Replacement
- Spring Harbor Watershed Study
- Starker Avenue Resurfacing with Utilities
- State Street Campus Garage Mixed-Use Project
- Stricker Forebay Dredge
- Strickers/Mendota Watershed Study
- Sunset Village: Hillcrest Dr., Standish Ct., Alden Dr.
- Tancho Drive Bike Path
- Tenney Park Beach Shelter
- Troy Dr/Green Ave Resurfacing & Knutson Dr Recon.
- University Avenue
- Upper Badger Mill Creek Watershed Study
- Village on Park Improvements
- Warner Beach Park Shelter
- Warner Park and Cherokee Marsh Watershed Study
- Warner Park Community Recreation Center Expansion
- West Streets Facility HVAC and Lighting Upgrade
- West Towne Path- Phase 2a