November 2, 2026 Update
Based on public input, the City updated the proposed maintenance access path location to be closer to the center of the greenway near the proposed low-flow channel. In addition to that design modification, the project will now be brought to the Board of Public Works for approval on 11/18/26, and construction will be delayed until the fall or winter of 2027 to avoid any risk of spring or summer rainstorms during construction.
You can learn more about these updates in Attic Angel Greenway Path Update slides.
View past project updates »Project Details
Project Information
Project Overview
The Attic Angels greenway between Blackwolf Drive and the ponds has sections of badly eroded channel. The City has tried to do spot repairs that have not been sufficient to address the problem, but these areas are getting larger. Therefore, the City is planning to repair the channel with a project in the fall and winter of 2027. To repair the channel, the City plans to create a low-flow channel that is lined with rock riprap.
Currently, the City does not have equipment access along the channel area to be able to respond to any channel repair issues, or down tree concerns. Therefore, as part of the project, the City is proposing to add a 10' maintenance access path through the greenway.
Additionally, the downstream ponds have been successful in helping remove sediment from our stormwater, which is their designed purpose. Some of that sediment has accumulated on the downstream end of the pond (in the far northeast corner of the east pond). This sediment is beginning to block the pipe that drains the pond. Therefore, while the upstream channel is being repaired, the City plans to have the sediment removed around the outfall as part of the scope of work as well. Construction access to the pond will be from the path along Globe Drive, as seen in the dashed yellow line on the figure below.
Project Limits
The project limits are within the greenway from Blackwolf Dr to the greenway outlet to the pond, and then at the northeast corner of the east pond.
Project Schedule
This project is scheduled to be constructed in fall and winter of 2027.
Public Involvement
There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:
Public Information Meetings
Oct. 15, 2026 Public Information Meeting Presentation
Oct. 15, 2026 Public Information Meeting Recording
City Process, Meetings
Board of Public Works Tentatively planning 11/18/26
If you wish to speak at the virtual meeting, you must register in advance.
You can register at http://www.cityofmadison.com/city-hall/ committees/meeting-schedule. Registration will open once the meeting is published on the Calendar, typically around noon on the Monday preceding the meeting, which in this instance is Monday, November 16, 2026. Interested participants need to search for the date, click on the Board of Public Works meeting, then click “Register for Public Comment."
Common Council Tentatively planning 11/24/26
Project Updates
November 2, 2026 Update
Based on public input, the City updated the proposed maintenance access path location to be closer to the center of the greenway near the proposed low-flow channel. In addition to that design modification, the project will now be brought to the Board of Public Works for approval on 11/18/26, and construction will be delayed until the fall or winter of 2027 to avoid any risk of spring or summer rainstorms during construction.
You can learn more about these updates in Attic Angel Greenway Path Update slides.
October 16, 2026 Update
Thank you to everyone who attended the Oct. 15, 2026 Public Information Meeting. The meeting materials are now available:
Oct. 15, 2026 Public Information Meeting Presentation
September 30, 2026 Update
A public information meeting is scheduled for 6 p.m., Oct. 15, 2026, via Zoom. Registration prior is required.
September 24, 2026 Update
There will be a virtual public information meeting sometime in October. The details will be posted to this webpage when they are available.