September 26, 2022: Construction!
Updated construction start and completion dates below.

Project Overview

Remove 100% of existing mortar and repoint using historically appropriate mortar type and profile at the Garver Office (Olbrich Cottage), a locally designated landmark that is also listed on the National Register of Historic Places. Remove unused metal anchors and remove and replace damaged brick with historically appropriate materials.

Project Schedule

City User Agency: City of Madison Parks
 
Planning and Design: In Process
1st Advertisement of Bid: June 03, 2022 Available on DemandStar and VendorNet
Pre-Bid Site/Bldg Tour: June 09, 2022 @ 2:00 p.m. at the project site, 3267 Garver Green, Madison, WI
Bid Due Date: June 23, 2022

Construction Start Date: As early as April 01, 2023
Expected Completion Date: Within (3) months of project start or November 30, 2023

"All information regarding dates/times/locations are informational and should be verified with the RFB documents"

Existing Project:

Garver Olbrich Cottage Front
Garver Office/Olbrich Cottage - Front Exterior
Garver Olbrich Cottage Rear
Garver Office/Olbrich Cottage - Rear/Side Exterior
Garver Olbrich Cottage Existing Masonry Conditions
Existing Masonry Conditions
Garver Olbrich Cottage Existing Masonry 2
Existing Masonry Conditions