Garver Office/Olbrich Cottage Masonry Repointing
Latest Update
July 05, 2023
B&B Restoration has finished the repointing work except for the sill replacement which will occur in the coming weeks. The mortar used for the repointing matches the mortar that was used on the Garver Feed Mill Building. Matching the mortar color and texture allows the buildings to have the appropriate historic appearance and to maintain their visual connection as the main mill building and the mill building’s front office. Mortar color is a small, but important detail to preserve the history of these designated landmark buildings.
Please visit the project Flickr page, at this LINK for progress photos.
Project Overview
Remove 100% of existing mortar and repoint using historically appropriate mortar type and profile at the Garver Office (Olbrich Cottage), a locally designated landmark that is also listed on the National Register of Historic Places. Remove unused metal anchors and remove and replace damaged brick with historically appropriate materials.
Project Schedule
Bid Due Date: June 23, 2022
Construction Start Date: As early as April 01, 2023
Expected Completion Date: Within (3) months of project start or November 30, 2023
"All information regarding dates/times/locations are informational and should be verified with the RFB documents"
Progress Photos - May 30, 2023 (More photos can be found on the project Flickr page, at this LINK)


Existing Project: