Utility Materials Handling Site
January 9, 2026 Update
Quarter 1 2026 Update
RFP #14073-0-2025-TJ proposals for A/E consulting and design services were received in November and evaluated by the review panel for the Utility Materials Handling Site project. We are currently in City process for approval to enter into a contract with Dimension IV Madison Design Group, see Legistar #91438. We plan to have a signed contract and begin Pre-Design in mid February.
Project Details
Project Information
Project Overview
This project is for creation of a new disposal site for the Sanitary Sewer, Stormwater, and Water Utilities, allowing for the disposal of excess cut from repair operations and to allow for the dewatering of dredge sediments from pond maintenance operations. Once dewatered, the material is expected to be moved to a final disposal location on this same site. The Utilities' current disposal site is running out of fill area, and with the planned increase in dredging of stormwater retention facilities/ponds as required for compliance with the City's EPA Wisconsin Pollutant Discharge Elimination System (WPDES) discharge permit, the current drying bed, the Madison Metropolitan Sewerage District Drying Bed, is becoming too small. Sewer Utility will own the site and Stormwater Utility and Water Utility will annually pay for their usage of it.
Project Schedule
City User Agency: City of Madison Engineering
A/E Consultant RFP #14073-0-2025-TJ Advertisement: October 21, 2025
A/E Consultant RFP Due Date: November 18, 2025
RFP documents can be found on VendorNet and DemandStar
"All information regarding dates/times/locations are informational and should be verified with the RFP documents"
Planning and Design: March 2026 through August 2026
Construction and Bid Doc Preparation: September 2026 through December 2026
1st Advertisement of Bid: January 2027 available only on Bid Express
Contractor's Bid Talk (Virtual): TBD
Bid Due Date: TBD
Construction Start Date: TBD
Expected Completion Date: December 2027
"All information regarding dates/times/locations are informational and should be verified with official bidding documents posted on Bid Express."
Public Involvement
There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations will be indicated below as this project progresses.
Public Information Meetings
TBD
City Process Meetings
Jan. 27, 2026 Common Council File #91438
Jan. 20, 2026 Finance Committee File #91438
Jan. 14, 2026 Board of Public Works File #91438
Authorizing the Mayor and City Clerk to enter into a three year, competitively selected service contract with Dimension IV – Madison, LLC for professional architectural and engineering design consulting services.
Project Updates
January 9, 2026 Update
Quarter 1 2026 Update
RFP #14073-0-2025-TJ proposals for A/E consulting and design services were received in November and evaluated by the review panel for the Utility Materials Handling Site project. We are currently in City process for approval to enter into a contract with Dimension IV Madison Design Group, see Legistar #91438. We plan to have a signed contract and begin Pre-Design in mid February.