The project consists of improvements to the existing West Towne Detention Basin on Madison's west side. The primary goal of these improvements is to increase the stormwater storage capacity of the detention pond, thereby reducing future peak stormwater flood elevations in the area. This will be achieved by connecting and expanding the two larger wet cells on site and excavating approximately 204,000 cubic yards of material from the area. Other added benefits to this property will include the addition gravel access paths to provide easier access and improve maintenance to the area. Wet forebay settling areas will be added to the northwest and southeast side of the site to collect sediment before it enters the main pond wet area. The area will be seeded with native species, which will enhance ecological diversity of the area and be beneficial to pollinators and urban wildlife.
Project Limits
Within the City's stormwater utility parcel. Located east of Gammon Pl/Gammon Rd between Mineral Point Road and Odana Rd.
Project Schedule
Design and Permitting: 2026
Construction: Anticipated to begin winter late 2026/early 2027
Public Involvement
There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:
Public Information Meetings
A public information meeting has not been scheduled yet. Check back to this project page for more details.
Postcards have been mailed to the adjacent landowners informing them that Madison is collecting information for planning and early design analysis.
City Process, Meetings
Common Council: Information will be posted when available.
Board of Public Works: Information will be posted when available.
Project Updates
March 11, 2026 Update
This project page has been created. Preliminary design is currently underway, and a public information meeting is coming soon.