Dickson Pl, Irwin Pl, Dodge St, Carver St, Martin St Reconstruction

October 5, 2026 Update

As part of this project, the City will be installing new sanitary sewer mains and lateral stubs within the roadways in an effort to eliminate existing backyard sewer mains that are difficult for our maintenance crews to access and adequately clean and have caused sewer backups in the past due to poor condition. A letter was recently sent to select properties currently served by these backyard sanitary sewer mains explaining the City's reimbursement policy for plumbing conversions and lateral relocations to the new City sanitary sewer mains. 
View the City's Plumbing Conversion Reimbursement: 

The City encourages property owners to contact the project's sewer designer with any questions about the reimbursement policy or any other sewer-related questions.

ADDITIONALLY, the City encourages properties that received this letter to contact the project's sewer designer if there are preferential locations you would like your property's new lateral(s) to be placed. The City will attempt to accommodate property owner preferences for new lateral location(s) on this project to the greatest extent feasible. 

View past project updates »

Project Details

Location

2022 Dodge Street
Madison, WI 53713

Status

Planning

Estimated Schedule

–

Impact

Major

Alder District

  • District 13

Project Information

Project Overview

The City of Madison is planning to reconstruct streets and utilities within the Lake Forest neighborhood over three phases of construction.  The first phase is planned to include Dickson Place, Irwin Place, Dodge Street, and portions of Martin Street and Carver Street.  The project will include full removal and replacement of the asphalt pavement and gravel base, installation of new sidewalk, bike paths, and replacement of storm sewer, sanitary main, and water main utilities.

Project Limits

  • Dickson Place – Martin Street to Carver Street
  • Irwin Place – Martin Street to Carver Street
  • Dodge Street – Martin Street to Carver Street
  • Carver Street – Fish Hatchery Road to Dunn Place
  • Martin Street – Fish Hatchery Road to Dickson Place

Project Schedule

  • Design: Fall/Winter 2026
  • Bids Advertised: Spring 2027
  • Construction: Summer 2027

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

City Process, Meetings

  • Common Council: More information will be posted when available.
  • Board of Public Works: More information will be posted when available.
  • Transportation Commission: More information will be posted when available.

Project Updates

October 5, 2026 Update

As part of this project, the City will be installing new sanitary sewer mains and lateral stubs within the roadways in an effort to eliminate existing backyard sewer mains that are difficult for our maintenance crews to access and adequately clean and have caused sewer backups in the past due to poor condition. A letter was recently sent to select properties currently served by these backyard sanitary sewer mains explaining the City's reimbursement policy for plumbing conversions and lateral relocations to the new City sanitary sewer mains. 
View the City's Plumbing Conversion Reimbursement: 

The City encourages property owners to contact the project's sewer designer with any questions about the reimbursement policy or any other sewer-related questions.

ADDITIONALLY, the City encourages properties that received this letter to contact the project's sewer designer if there are preferential locations you would like your property's new lateral(s) to be placed. The City will attempt to accommodate property owner preferences for new lateral location(s) on this project to the greatest extent feasible. 

September 28, 2026 Update

The design team will present the project to the Transportation Commission on September 30, 2026 for approval. 

Members of the public are encouraged to watch, register in support/opposition, speak (3 minutes), and/or submit written comments. You can send an email to TransportationCommission@cityofmadison.com to voice your opinion for the project.

To register for the upcoming meeting, visit the City's website (https://www.cityofmadison.com/city-hall/committees/meeting-schedule/register).  If you register to speak, make sure the name you display in Zoom matches the name you registered under so staff know who to unmute when it's your turn. TC meetings start at 5 p.m. and individual project reviews start based on their placement on the agenda.

August 28, 2026 Update

Thank you to everyone who attended the Aug. 27, 2026 Public Information Meeting. The meeting materials are now available: 

August 4, 2026 Update

A public information meeting is scheduled for 6 p.m., Aug. 27, 2026, via Zoom. Registration prior is required. 

Aug. 27, 2026 Public Information Meeting Registration

 

April 16, 2026 Update

A right of way exhibit has been uploaded for the streets in the Lake Forest neighborhood.  The red linework displayed in the exhibit is the right of way boundary between public and private property.  Right of way is dedicated for streets, sidewalk, underground utilities, and other public infrastructure.  Please review the exhibit to determine any privately owned items that are within the right of way and likely to be impacted by the planned street construction projects.

Project Exhibit

February 27, 2026 Update

Thank you to everyone who attended the Feb. 26, 2026 Public Information Meeting. The meeting materials are now available: 

Feb. 26, 2026 Public Information Meeting Recording

Feb. 26, 2026 Public Information Meeting Presentation

February 9, 2026 Update

This page has been created. 
A public information meeting is scheduled for 6 p.m., Feb. 26, 2026, via Zoom. Registration prior is required. 

Feb. 26, 2026 Public Information Meeting Registration 

Was this page helpful to you? * required