Moorland Rd Shared-Use Path
February 10, 2026 Update
This page has been created. A public information meeting is scheduled for 6 p.m., March 11, 2026, via Zoom. Registration prior is required.
March 11, 2026 Public Information Meeting Registration
View past project updates »Project Details
Project Information
Project Overview
The proposed project includes construction of an approximately 0.6-mile-long, shared-use path on the south-side of Moorland Rd from Wayland Dr to Raywood Rd/South Towne Dr with a connection to the Capital City Trail. The project will create a safe bike and pedestrian facility along a stretch of Moorland Rd that is currently without sidewalk. The new path will provide a safe and direct connection for the Highland Manor mobile home park to access the nearby Elementary and Middle School on the west-end of Moorland Rd. The project will consist of removing the existing on-street bike lanes on Moorland Rd and bumping out the south-side curb line to make room for the off-street, shared-use path facility that will largely stay within existing City Right-of-Way and avoid major impacts to existing trees. The project will include storm sewer adjustments as needed as well as new path lighting along the shared-use path.
Project Limits
Moorland Rd: Wayland Dr to Raywood Rd/South Towne Dr
Project Schedule
- Design/Bidding: 2026-2027
- Construction: Spring 2028
Public Involvement
There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:
Public Information Meetings
There is a virtual public information meeting scheduled for Wednesday, March 11th at 6pm.
City Process, Meetings
Common Council Fall 2026
Board of Public Works Fall 2026
Project Updates
February 10, 2026 Update
This page has been created. A public information meeting is scheduled for 6 p.m., March 11, 2026, via Zoom. Registration prior is required.