Phase 2 (Lakeside to Olin)

Phase Two of the project includes the segment from E Olin Ave to E Lakeside St and has been selected for funding and is expected to be constructed in 2028. 

View Phase 2 Plan.

Phase Two (John Nolen Dr: E Olin Ave to E Lakeside St) will include the following improvements:

  • Full pavement and curb & gutter replacement
  • Lane width and cross-section changes to urbanize the roadway and provide traffic calming
  • Reconstruction of storm sewer, including large catch basins for sediment/pollutant collection
  • Improved traffic signals and street lighting
  • Improvements to the E Lakeside St intersection to improve bike-pedestrian safety and accessibility, including shortened crossings and additional sidewalk
  • Bridge structure wingwall repairs to Wingra Creek roadway bridge
Was this page helpful to you? * required