STBG–Urban & TAP Projects Summary

The Greater Madison MPO administers federal funding for transportation projects across the region. Two of these programs—the Surface Transportation Block Grant–Urban (STBG–Urban) and Transportation Alternatives Program (TAP)—provide funding for roadway, transit, bicycle, pedestrian, and other transportation improvements.

  • Surface Transportation Block Grant–Urban (STBG–Urban) provides flexible funding for roadway, transit, bicycle, and pedestrian infrastructure improvements that enhance mobility and connectivity in the Madison Urban Area.
  • Transportation Alternatives Program (TAP) supports projects that enhance non-motorized transportation, including pedestrian and bicycle infrastructure and Safe Routes to School plans and programs.

Below is a breakdown of STBG–Urban and TAP project funding included in the 2027–2031 Transportation Improvement Program, including federal funding amounts, total construction costs, federal shares, and project notes.

  • $60.2M Transportation Dollars Invested, 2027–2031

Surface Transportation Block Grant–Urban (STBG–Urban)

Federal Fiscal Year 2026

ProjectLimitsFederal FundsTotal Construction CostFederal Share

Rideshare/TDM Program

Notes: Ongoing support per MPO policy. 4% annual increase starting in 2026 (previously 3%).

Madison MPO Area, 2026–June 2027$109,680$137,10080.00%

Pedestrian/Bike Safety Education

Notes: Ongoing support per MPO policy. 3% annual increase.

City of Madison, 2026–June 2027$94,800$118,50080.00%

City of Madison – Mineral Point Road

Notes: TIP Amendment No. 21: Increased total construction cost from $5,772,000 to $14,736,411 and increased federal funding by $535,285.63. TIP Amendment No. 23: Reduced total construction cost from $14,736,411 to $6,502,871 due to a stormwater scope change. No change to the federal funding amount.

USH 12 to High Point Road$5,135,286$6,502,87178.97%

City of Madison – S. High Point Road Extension

Notes: TIP Amendment No. 21: Reduced total construction cost from $3,000,000 to $2,195,550 and reduced federal funding by $643,559.83.

Raymond Road to Midtown Plat Limit$1,756,440$2,195,55080.00%

Dane County – CTH MM/Rimrock Road

Notes: TIP Amendment No. 21: Increased total construction cost from $1,356,000 to $1,924,243 and increased federal funding by $33,955.00. TIP Amendment No. 24: Added $159,652.62 in federal funding.

USH 12/18 to CTH MC/John Nolen Drive$1,278,088$1,924,24366.42%
Total $10,522,534$14,278,488 

Federal Fiscal Year 2027

ProjectLimitsFederal FundsTotal Construction CostFederal Share

Rideshare/TDM Program

Notes: Ongoing support per MPO policy. 4% annual increase. Potential TIFIA funding.

Madison MPO Area, 2027–June 2028$114,067$142,58480.00%

Pedestrian/Bike Safety Education

Notes: Ongoing support per MPO policy. 3% annual increase. Potential TIFIA funding.

City of Madison, 2027–June 2028$96,648$120,81080.00%

City of Madison – Glacial Drumlin Trail

Notes: Proposed addition of $734,763 in federal funding. Total proposed STBG–Urban funding: $8,891,520. 80% federal cost share based on the previous construction cost estimate of $11,114,000.

IH 39/90 to CTH AB$8,891,520$12,156,75773.14%

Village of DeForest – Vinburn Road

Notes: 8/5/26: Proposed addition of $182,696 in federal funding. Total proposed STBG–Urban funding: $2,210,839. 80% federal cost share based on the current construction cost estimate.

Main Street to North Towne Road$2,210,839$2,763,54980.00%
Total $11,313,074$15,183,700 

Federal Fiscal Year 2028

ProjectLimitsFederal FundsTotal Construction CostFederal Share

Rideshare/TDM Program

Notes: Ongoing support per MPO policy. 4% annual increase.

Madison Area MPO$118,630$148,28880.00%

Pedestrian/Bike Safety Education

Notes: Ongoing support per MPO policy. 3% annual increase.

City of Madison – 2028$99,547$124,43480.00%
City of Sun Prairie – O'Keeffe AvenueReiner Road to Summerfield Way$1,464,190$2,253,00064.99%

City of Madison – West Towne Path

Notes: Construction cost increased from $3,740,000 to $3,927,000.

Gammon Road to High Point$2,431,000$3,927,00061.90%

City of Madison – John Nolen Drive

Notes: Construction cost increased from $6,870,000 to $8,094,000.

Olin Avenue to Lakeside Street$4,465,500$8,094,00055.17%
Village of DeForest – East Holum StreetMarket Street to North Towne Road$2,560,184$3,939,00065.00%
Total $11,139,051$18,485,722 

Federal Fiscal Year 2029

ProjectLimitsFederal FundsTotal Construction CostFederal Share

Rideshare/TDM Program

Notes: Ongoing support per MPO policy. 4% annual increase.

Madison Area MPO$123,375$154,21980.00%

Pedestrian/Bike Safety Education

Notes: Ongoing support per MPO policy. 3% annual increase.

City of Madison – 2029$102,534$128,16880.00%
City of Sun Prairie – St. Albert Great DriveBroadway Drive to N. Bird Street$806,390$1,241,00064.98%

City of Madison – John Nolen Drive/Olin Avenue

Notes: Construction cost increased from $11,750,000 to $12,338,000.

USH 12 Beltline Ramp to Wingra Creek$7,637,500$12,338,00061.90%
City of Monona – Nichols RoadWinnequah Road to Monona Drive$1,095,250$1,685,00065.00%

Village of Windsor – Windsor Road Sidepath

Notes: Qualifies for a 76.41% federal share based on the cost formula for projects under $1 million in the Selection Process Document.

N. Towne Road to Windsor Ridge Lane$473,413$619,57076.41%
Total $10,238,462$16,165,957 

Federal Fiscal Year 2030

ProjectLimitsFederal FundsTotal Construction CostFederal Share

Rideshare/TDM Program

Notes: Funding approved by the MPO in November 2025.

Madison Area MPO$128,310$160,38880.00%

Pedestrian/Bike Safety Education

Notes: Funding approved by the MPO in November 2025.

City of Madison – 2030$105,610$132,01380.00%

City of Fitchburg – Irish Lane

Notes: Funding approved by the MPO in November 2025. Construction cost increased from $2,635,000 to $2,700,000.

S. Fish Hatchery Road to S. Syene Road$1,692,710$2,700,00062.69%

City of Madison – Pleasant View Road

Notes: Funding approved by the MPO in November 2025.

Mineral Point Road to Timber Wolf Trail$6,102,020$9,500,00064.23%

City of Sun Prairie – Columbus Street

Notes: Funding approved by the MPO in November 2025.

Wilburn Road to Laura Street$944,579$1,471,00064.21%
Total $8,973,229$13,963,401 

Federal Fiscal Year 2031

ProjectLimitsFederal FundsTotal Construction CostFederal Share

Rideshare/TDM Program

Notes: Funding approved by the MPO in November 2025.

Madison Area MPO$133,442$166,80380.00%

Pedestrian/Bike Safety Education

Notes: Funding approved by the MPO in November 2025.

City of Madison – 2031$108,778$135,97380.00%

City of Madison – Midtown Road

Notes: Funding approved by the MPO in November 2025. Construction cost increased from $16,500,000 to $16,570,000.

Waldorf Boulevard to Muir Field Road$10,598,245$16,570,00063.96%
Total $10,840,466$16,872,776 

Grand Total: FFY 2027–2031

Total Federal Funds: $52,504,282
Total Construction Costs: $80,671,556

Transportation Alternatives Program (TAP)

Federal Fiscal Year 2026

ProjectLimitsFederal FundsTotal Construction CostFederal ShareNotes
City of Sun Prairie – Wayfinding SignsVarious Locations, City of Sun PrairieFY 2025 authorized: $146,089.
City of Madison – Bike Traffic CountersVarious Locations, City of MadisonFY 2024 redistribution: $132,000.
Total $0$0  

Federal Fiscal Year 2027

ProjectLimitsFederal FundsTotal Construction CostFederal Share
Bike Fed – Safe Routes to School K–12Dane County$169,680$212,00080.04%
City of Fitchburg – CTH MM UnderpassLacy Road to McCoy Road$432,000$756,00057.14%
City of Madison – E. Rusk Avenue PathN. Rusk Avenue to Rimrock Road$755,164$1,150,00065.67%
City of Madison – Moorland Road PathWayland Drive to Capital City Trail$748,935$1,141,00065.64%
City of Madison – Capital City Path ExtensionVondron Road to IH 39/90$1,511,200$2,580,00058.57%
Total $3,616,979$5,839,000 

Federal Fiscal Year 2028

ProjectLimitsFederal FundsTotal Construction CostFederal Share
Bike Fed/Dane County – Safe Routes to School K–12Dane County$169,680$212,00080.04%
Sun Prairie Safe Routes to SchoolSun Prairie School District$120,000$150,00080.00%
City of Madison – Woodward Drive PathSheridan Drive to Forster Drive$980,524$1,494,00065.63%
Total $1,270,204$1,856,000 

Federal Fiscal Year 2029

ProjectLimitsFederal FundsTotal Construction CostFederal Share
Bike Fed/Dane County – Safe Routes to School K–12Dane County$229,840$287,30080.00%
City of Madison – W. Beltline PathExisting Path to Landmark Place$1,000,500$1,672,50059.82%
Total $1,230,340$1,959,800 

Federal Fiscal Year 2030

ProjectLimitsFederal FundsTotal Construction CostFederal Share
Bike Fed/Dane County – Safe Routes to School K–12Dane County$233,328$291,66080.00%
City of Sun Prairie – ADA Transition PlanCity of Sun Prairie$120,000$150,00080.00%
City of Fitchburg – Traceway and Leopold PathTraceway Drive and Post Road; Cannonball Path to Traceway Drive$758,034$1,265,00059.92%
City of Middleton – BCycleCity of Middleton$247,331$310,60079.63%
City of Verona – N. Main Street (CTH M) PathBering Drive to Cross Country Road$305,797$430,70071.00%
Total $1,664,490$2,447,960 

Grand Total: FFY 2026–2030

Total Federal Funds: $7,782,013
Total Construction Costs: $12,102,760

Was this page helpful to you? * required