North Franklin Avenue and Stevens Street Resurfacing

April 4, 2024 Update

The design team presented the project to the Board of Public Works on April 3, 2024. The Board approved the plans, specifications and assessments.

View past project updates »

Project Details

  • Location

    • 422 N Franklin Ave.
      Madison, WI 53705
  • Status

    In Design
  • Estimated Schedule

  • Impact

    Minor
  • Alder District

    District 5
  • Contract Number

Project Information

Project Overview

North franklin avenue and stevens street resurfacing map

This project will replace aging and deteriorating utilities in N Franklin Avenue and Stevens Street. In N Franklin Avenue sanitary sewer, storm sewer, and water main will be replaced.  In Stevens Street sanitary main and laterals, and storm sewer main and inlets will be replaced. For both N Franklin Avenue and Stevens Street there will be a replacement of gravel base and asphalt with spot replacement of curb, sidewalk and driveway aprons.

Project Limits

N Franklin Ave – University Ave to Regent St

Stevens St. – N Franklin Ave to Grand Ave

Project Schedule

Stevens St:

  • Bid Advertisement: Spring 2024
  • Construction: Summer/Fall 2024

N Franklin Ave:

  • Bid Advertisement: To be determined
  • Construction: Spring/Summer 2025

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are to be determined.

Public Information Meetings

A public information meeting was held on Jan. 30, 2024. 
The meeting recording will be posted when available. 

City Meetings, Process

Stevens St:

N Franklin Ave:

Si necesita un intérprete, un traductor, materiales en formatos alternativos u otros arreglospara acceder a este servicio, actividad o programa, comuníquese inmediatamente al número de teléfono que figura a continuación.

Yog tias koj xav tau ib tug neeg txhais lus, ib tug neeg txhais ntawv, cov ntaub ntawv ua lwm yam los sis lwm cov kev pab kom siv tau qhov kev pab, kev ua num los sis kev pab cuam no, thov hu rau tus xov tooj hauv qab no tam sim no.
​​​

Project Updates

The design team presented the project to the Board of Public Works on April 3, 2024. The Board approved the plans, specifications and assessments.

Thank you to everyone who attended the Jan. 30, 2024 Public Information Meeting. Meeting materials are now available: 

Jan. 30, 2024 Public Information Meeting Recording

A questionnaire has been created for anyone impacted by this project. Please complete the questionnaire by 5 p.m., Feb. 6, 2024: https://www.surveymonkey.com/r/DZ73MQP

A public information meeting is scheduled for 5:30 p.m., Jan. 30, 2024, via Zoom. Registration prior is required. 
Jan. 30, 2024 Public Information Meeting Registration

A questionnaire has been created for anyone impacted by this project. Please complete the questionnaire by 5 p.m., Feb. 6, 2024: https://www.surveymonkey.com/r/DZ73MQP

A questionnaire has been created for anyone impacted by this project. Please complete the questionnaire by 5 p.m., Feb. 6, 2024: https://www.surveymonkey.com/r/DZ73MQP

This page has been created to provide information regarding the project and proposed improvements.  On this page you will find important information such as project extents, project limits, project overview and important dates.  Regular updates will be posted on this page containing new information with the passing of each phase.

Was this page helpful to you?