Sidewalk Replacement Program

May 2, 2024 Update

Thank you to everyone who attended our public information meeting for District 11. The meeting materials are now available: 

May 1, 2024 Public Information Meeting Recording

May 1, 2024 Public Information Meeting PowerPoint Presentation

View past project updates »

Project Details

  • Project Type

  • Status

    Bidding
  • Estimated Schedule

  • Impact

    Minor
  • Alder District

    District 11
    District 19
  • Contract Number

Project Information

Project Overview

The Annual Sidewalk Replacement Program was created to identify and repair defects (cracks, broken sections, offsets creating trip hazards, ponding/icing issues) throughout the City, rotating through the alder districts on a 10-year cycle.

In 2024, the Sidewalk Replacement Program will be performing work within Aldermanic Districts 11 and 19.

Sidewalk sections marked with white arrows or X’s are designated for replacement.  Sidewalk sections with tripping hazards, marked with a pink line across the joint and a white ‘C’, are designated for saw cutting.  Separate contracts are bid for the replacement and the saw cutting.

Project Limits

Each cycle focuses on different districts. In 2024, sidewalk sections will be repaired and replaced throughout Aldermanic Districts 11 & 19.

Project Schedule

District 19: 04/8/2024 to 10/04/2024

District 11: 05/20/2024 to 10/25/2024

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

If you need an interpreter, translator, materials in alternate formats or other accommodations to access this service, activity or program, please call Bill McGlynn of the Engineering Division at 608-266-4537.

Si necesita un intérprete, un traductor, materiales en formatos alternativos u otros arreglos para acceder a este servicio, actividad o programa, comuníquese inmediatamente al número de teléfono que figura a continuación.

Yog tias koj xav tau ib tug neeg txhais lus, ib tug neeg txhais ntawv, cov ntaub ntawv ua lwm yam los sis lwm cov kev pab kom siv tau qhov kev pab, kev ua num los sis kev pab cuam no, thov hu rau tus xov tooj hauv qab no tam sim no.

City Process, Meetings

Common Council: Dist 19 – 01/23/2024      Dist 11 – 03/05/2024

Board of Public Works: Dist 19 – 01/10/2024      Dist 11 – 02/21/2024

Sidewalk Repair Schedule by Alder District

YearAlder District & Ward
2017

Districts 15 & 17

2018

Districts 3 & 16

2019

Districts 1, 7 & 9

2020

Districts 4 & 8

2021

Districts 13 & 14

District 14:

District 13: 

2022

District 5

2023

Districts 12 & 18

2024

District 11 & 19

2025District 10* & 20 (*Except District 10, Ward 79. Previously District 14, Ward 75 completed in 2021)
2026District 2 & 6
2027District 3 & 17
2028District 15 & 16
2029District 1 & 9
2030District 4 & 13 (Census)
2031District 5 & 8
2032District 7 & 20
2033District 10 & 14
2034District 12 & 18
2035District 11 & 19
2036District 2 & 6
2037District 3 & 17
2038District 15 & 16
2039District 1 & 9
2040District 4 & 13 (Census)
2041District 5 & 8

Forms

List of Prequalified Contractors

Related Ordinances, Statutes, & Administrative Procedures

Project Updates

Was this page helpful to you?