Archived Projects
These projects are complete. This information is available for reference. If you need an accessible version of this content, please report an accessibility issue.
- Near West Watershed Study
- New Sidewalk Installation -- 2022
- North Brooks Street, Fahrenbrook Court and College Court Resurfacing
- North Franklin Avenue and Stevens Street Resurfacing
- North Lake Street Boat Ramp
- Oak Street
- Odana Rd at Research Park Blvd
- Ohmeda Drive Reconstruction
- Olbrich Gardens - Hot Water Solar
- Olbrich Gardens Expansion - Project 1
- Olbrich Gardens Royal Thai Pavilion Roof Replacement
- Olbrich Roof Replacements
- Old Middleton Road and Craig Avenue Resurfacing
- OLD SAUK RD
- Olin Ave Waste Transfer Tipping Room Floor Replacement
- Olin Park Facility Renovation
- Olin Waste Transfer Drop-off Site
- Olin-Turville Ct and E. Lakeside Street Resurfacing
- Ontario Park Path (Bike Paths 2018)
- Packers Avenue Resurfacing
- Park Edge Drive Flood Mitigation
- Park Street Joint Repair
- Parks Summit Maintenance Facility
- PE/PR Neighborhood Employment Center
- Pine Street Reconstruction
- Pinney Neighborhood Library
- Pleasant View Rd & Blackhawk Rd Intersection
- Pleasant View Road
- Prairie Hills Pond Dredging
- Prospect Ave., N Reconstruction
- Public Health Office Remodel
- Railroad Arch Culvert Repair at Southwest Bike Path
- Reetz Road and Altem Circle
- Regent Street Culvert Replacement at Kenosha Drive
- Reindahl Restroom Remodel
- Rennebohm Park Shelter Restroom Renovation
- Rethke Avenue
- Robin Greenway and Orchard Drive Culvert
- Rockstream Drive
- Ronald Reagan Ave, John Wall Dr, Merchant St
- Russell Street Reconstruction
- Rutledge Street Reconstruction
- S. Pinckney Street Resurfacing
- Sauk Creek Greenway Restoration - Tree Lane to S. High Point Road
- Schenk St and Richard St Resurfacing with Utilities
- Schewe Road
- Schmitt Place Reconstruction
- Senior Center Lighting Replacement
- Shawnee Pass
- Sheboygan/Segoe Redesign
- Shepard Ter, Chamberlain Ave, Van Hise Ave and Mason St Resurfacing
- Solar Electric - Fire Station 07 & MPD West District
- Solar PV - CDA Truax Apartments
- Solar PV - EOF Canopy
- Solar PV - Fire Station 09
- Solar PV - Fire Station 14
- Solar PV - Metro Phase 3
- Solar PV - Police East District
- Solar PV - Police Training
- Solar PV - Streets Waste Transfer Station
- Solar PV - Tenney Park Pavilion
- Solar PV - Water Utility Paterson Operations
- Solar PV – Fire Station 02
- Solar PV – Fire Station 08
- Solar PV – Fleet Phase 2
- Solar PV – Streets West Phase 2
- Solar PV – Warner Park Beach Shelter
- Solar PV – Water Utility Olin Ave
- Solar PV – Water Utility Paterson Vehicle Storage
- South Charter Street Alley
- South Madison Demolitions & Site Restorations
- South Owen Drive Reconstruction
- South Owen Drive, Keating Terrace and Caromar Drive Resurfacing
- South Park Street Concrete Pavement Repairs
- South Paterson Street Sanitary Sewer Replacement
- South Point Road - 2019
- South Point Scale & Fueling
- South Towne Dr/W. Broadway Bridge over us 12/18 (Madison Beltline)
- Southwest Bike Path Resurfacing
- Southwest Bike Path/Waite Circle Culvert Reconstruction
- Southwest Path and Paunack Park Path Resurfacing
- Spongy Moth Genetic Research Partnership
- Spring Harbor Dredge
- Spring Harbor Outfall Repair
- Spring Harbor Watershed Study
- St. Paul Avenue, Ohio Avenue, Talmadge Street, Jackson Street, Lafollette Avenue Reconstruction
- Starker Avenue Resurfacing with Utilities
- State Street Sidewalk Repairs
- Streets West - Wash Bay
- Streets West Vehicle Storage - PV Installation
- Stricker Forebay Dredge
- Strickers/Mendota Watershed Study
- Sunset Village: Hillcrest Dr., Standish Ct., Alden Dr.
- Sycamore Ave Public Works Maint. Facility Upgrades
- Sycamore Park Parking Lot Replacement
- Sycamore Truck Scale Project
- Tancho Drive Bike Path
- Tenney Park Beach Shelter
- Tenney Park Pavilion Acoustic Plaster Ceiling
- Toepfer, Holly, Euclid, and St. Clair Resurfacing w/ Utilities