Completed Projects
- 2018 – 2023 Park & Open Space Plan
- 2022 Fencing Improvements
- 2022 Sport Court Resurfacings
- 2023 Invasive Vegetation Management
- 2023 Sport Court Resurfacings
- 3400 Block East Washington Ave Sewer Replacement
- 5630 Schroeder Rd
- Acacia Ridge Park Master Plan
- Adams St-Jefferson St 1900 Block Alley Reconstruction
- Aldo Leopold Park Pump Track
- Alicia Ashman Library
- Allis/Spaanem/Shaffer Water Main Installation
- American Parkway Sidewalk
- Anderson Street
- Ash Tree Removals and Replacements in Parks
- Atticus Way
- Atwood Avenue
- Autumn Ridge Path
- Badger Park Basketball Court Replacement
- Bassett St, N. - 2019
- Bassett Street
- Baxter Park Basketball Court Replacement
- Beltline / Verona Road
- Bikeways 2022: Path Resurfacings & Bay Creek Bike Improvements
- Bikeways 2023
- Blackhawk Ave, N.-Bruce Ct-Heather Crest Resurfacing
- Blackhawk Tower Radio Equipment Shelter
- Blackhawk Water Tower
- Blair Street South
- Blair Street, N Reconstruction
- Blair Street/John Nolen Drive Corridor Study
- Bowman (Duane F.) Park Improvements
- Breese Stevens Field Improvements
- Bridge Repairs 2020
- Brittingham Boathouse Exterior Painting
- Brittingham Park
- Broom St (W. Washington - Dayton)
- Bryan St, Daley Dr, James St, Thorp St Reconstruction
- Buckeye Rd
- Burr Jones Park Improvements
- Burr Jones Shoreline Steel Seawall Removal
- Calypso Rd and Fremont Ave Resurfacing with Utilities
- Campbell Street - Vilas Avenue
- Campus Drive - Bridge Repairs 2017
- Cannonball Single Track Trail Improvements
- Capital City Path Segment 1 (Buckeye Rd to Dondee Road)
- Capital City Trail Epoxy Coating
- Capitol East District Parking Structure
- CCB Floors 1, 4 & 5 Office Remodels
- Cedar St., South St., High St., W Wingra Dr.
- Cedar Street, Beld Street Reconstruction, Cedar Street Phase 2 Construction
- Central Library
- Commercial Avenue Sanitary Sewer Reconstruction
- Cottage Grove Road (I39 to Sprecher Rd)
- Country Grove Park Master Plan
- Country Grove Park Path Replacement
- Country Grove Park Shelter
- Country Grove Park Shelter
- County Highway M & S
- County Highway M - Prairie Hill to Cross Country
- County Highway PD
- Cub Foods Demolition
- Dairy Drive
- Darbo Drive to Webb Avenue Connection
- Darwin Road
- Davidson St, Drexel Ave, Lake Edge Blvd.
- Davies Street and Dempsey Road Reconstruction
- Dayton Street, West
- Dean Ave., East and Allis Ave.
- Dearholt Road Resurfacing (Milward Drive to Odana Road)
- Demetral Park Path: Phase 2
- Doncaster Beverly Danbury Reconstruction
- Door Creek Park Shelter
- Door Creek Park Shelter
- Dunning Street, Jackson Street, Lafollette Avenue Reconstruction
- E Wilson Street and E Doty Street Reconstruction
- Eagle Trace Park Master Plan
- Eagle Trace Park Master Plan Improvements
- East Badger Mill Creek Watershed Study
- East Dayton Street Resurfacing
- East District Police
- East Side Water Supply Project
- East Towne Detention Basin Improvements
- East Washington Bridge Repairs
- Eken Park Neighborhood Planning Project
- Eken Park Playground Improvements
- Elizabeth Street - N Ingersoll Street
- Elvehjem Park Nature Play Area
- Elver Park Disc Golf Course Redesign
- Elver Park Improvements
- Emerson St, Lowell St Reconstruction
- Engineering Operations Facility - Canopy Replacement/Expansion
- Evergreen, Ohio, Sommers Reconstruction
- Fairchild Building Study
- Far West Public Works Facility
- Felland Road and Tranquility Trail Roundabout
- Felland Road Reconstruction
- Fire Station 1/Fire Administration
- Fire Station 10 Lighting Retrofit
- Fire Station 10 Restrooms Remodel