Archived Projects
These projects are complete. This information is available for reference. If you need an accessible version of this content, please report an accessibility issue.
- 2018 – 2023 Park & Open Space Plan
- 2022 Fencing Improvements
- 2022 Sport Court Resurfacings
- 2023 Invasive Vegetation Management
- 2023 Sport Court Resurfacings
- 2025-2030 Park and Open Space Plan
- 811 Old Timber Pass Stormwater Pond & Greenway
- 9401 Watts Road Stormwater Pond & Greenway
- Acacia Ridge Park Master Plan
- Accessible Beach Improvements
- Adams St-Jefferson St 1900 Block Alley Reconstruction
- Aldo Leopold Park Pump Track
- Allis/Spaanem/Shaffer Water Main Installation
- Ash Tree Removals and Replacements in Parks
- Atticus Way
- Atwood Avenue
- Autumn Ridge Path
- Badger Park Basketball Court Replacement
- Badger Rusk Shared-Use Path
- Bartillon Shelter
- Baxter Park Basketball Court Replacement
- Blackhawk Water Tower
- Blair Street South
- Bowman (Duane F.) Park Improvements
- Breese Stevens Field - Athletic Field Turf Replacement Project
- Breese Stevens Field Improvements
- Brittingham Park Courts Fencing Replacement
- Broom St (W. Washington - Dayton)
- Buffalo Trail, Barron Court, Green Lake Pass
- Burr Jones Park Improvements
- Burr Jones Park Shoreline Steel Seawall Removal
- Burr Jones Shoreline Steel Seawall Removal
- Cannonball Single Track Trail Improvements
- Canter Park Development Plan
- CCB Floors 1, 4 & 5 Office Remodels
- CCB Remodel - DCR 104 & 108A
- Central Isthmus Watershed Study
- Cherokee No. 2 Lift Station Emergency Generator
- City Engineering Stormwater Utility Vegetation Management Plan
- Commercial Avenue Sanitary Sewer Reconstruction
- Country Grove Park Master Plan
- Country Grove Park Path Replacement
- Country Grove Park Shelter
- Country Grove Park Shelter
- Dairy Dr Campground Demolition and Site Restoration
- Davies Street and Dempsey Road Reconstruction
- Dearholt Road Resurfacing (Milward Drive to Odana Road)
- Doncaster Beverly Danbury Reconstruction
- Door Creek Park - Ice Rink
- Door Creek Park Shelter
- Door Creek Park Shelter
- E Wilson Street and E Doty Street Reconstruction
- Eagle Trace Park Master Plan
- Eagle Trace Park Master Plan Improvements
- East Badger Mill Creek Watershed Study
- East Isthmus and Yahara River Watershed Study
- East Side Water Supply Project
- East Streets Maintenance Facility Fire Sprinkler Replacement
- East Towne Detention Basin Improvements
- Eken Park Neighborhood Planning Project
- Eken Park Playground Improvements
- Elvehjem Park Nature Play Area
- Elver Park Disc Golf Course Redesign
- Elver Park Improvements
- Engineering Operations Facility Locker Room Renovation
- Evergreen, Ohio, Sommers Reconstruction
- Felland Road Reconstruction
- Fire Station 10 Restrooms Remodel
- Fire Station 14
- Fire Station 14 Training Site Phase 1
- Fire Station 8 Lighting Retrofit
- Fordem Avenue Sanitary Sewer Replacement
- Fraust Park Master Plan
- Galaxy Park Improvements
- Galaxy Park Master Plan
- Garner Park Playground Improvements
- Gates of Heaven Masonry Restoration
- Giddings Park Shoreline Riprap Repair
- Glacier Hill Park Drainage Project
- Glenway Golf Park
- Glenwood Park Railroad Arch Culvert Repair at Southwest Bike Path
- Glenwood Park Stabilization
- Greentree/McKenna Watershed Study
- Hammersley Road Resurfacing
- Harvey Schmidt Park Master Plan
- Hawks Landing Flood Mitigation
- Hawthorne Court Road Reconstruction
- Hillington Green Playground Replacement
- Hoover Boathouse Door, Window and Siding Replacement and Alternate #1: Exterior Painting
- Hudson, Miller, Willard, Center, Sommers Reconstruction
- James Madison Park Master Plan
- John Nolen Drive Watershed Study
- Kennedy Park Playground Improvements
- Kestrel Park Development
- Kestrel Park Development Plan
- Lake Mendota Drive
- Lake Monona Waterfront - Preliminary Report
- Lake Street Sanitary Sewer Replacement
- Lake View Reservoir Reconstruction
- Library Services and Support Facility Exterior Envelope